Contents
1 Introduction
1
Additional Documentation
1
Contact Information
1
2 General Information
3
Tools
3
Safety Equipment
4
Orientation Convention
4
Equipment Part and Option Identification
4
Torque Specifications
5
Cleaning
5
3 Getting Started
7
Baseline installation procedure
7
Installation and assembly requirements
7
Receiving Parts
7
Assembly and Installation Tips
8
Unpacking boxes
8
Fastener Tips
8
4 Assembly and Installation
9
Introduction
9
Procedure
9
Prepare Towers for installation
9
Anchor the towers to the floor
12
Install the Tower Placards
15
Install the Wall Bars
15
Install the Easy Shelf 35s
17
Anchor the Floor Fixings to the floor
19
Install remaining panels
22
Install the Unit Optionals
22
Install Placards, Labels, and Decals
23