Chapter 1 Installing the ValueLoader
Connecting the SCSI and Power Cables
12
ValueLoader LTO-1/LTO-2 Tape Autoloader User Manual
4
Slide the ValueLoader onto the rails and secure the mounting bracket
to the rack using the screws and clip nuts from the rackmount
hardware package, as shown in
Figure 7 Sliding the
ValueLoader into the
Rack Slot, Securing
Mounting Backet
Connecting the SCSI and Power Cables
1
To connect the SCSI and power cables to the ValueLoader, follow these
steps:
1
Shut down and turn off the selected server. Turn off all attached
accessory devices, such as printers and other SCSI devices. Remove
the power cables from the server and all attached accessories.
Caution:
Failure to remove the power cables from these devices
may result in damage to the ValueLoader.
Содержание Quantum ValueLoader
Страница 1: ...ValueLoader LTO 1 LTO 2 Tape Autoloader User Manual 6326705 03 A01...
Страница 6: ...iv ValueLoader LTO 1 LTO 2 Tape Autoloader User Manual...
Страница 8: ...Figures vi ValueLoader LTO 1 LTO 2 Tape Autoloader User Manual...
Страница 10: ...Tables viii ValueLoader LTO 1 LTO 2 Tape Autoloader User Manual...
Страница 76: ...Diagnostics and Troubleshooting ValueLoader Error Codes 62 ValueLoader LTO 1 LTO 2 Tape Autoloader User Manual...
Страница 86: ...Manufacturer Declaration 72 ValueLoader LTO 1 LTO 2 Tape Autoloader User Manual...
Страница 90: ...76 ValueLoader LTO 1 LTO 2 Tape Autoloader User Manual...