Chapter 2 Assembly & Installation
Models QT-740 & QT-750 - Service Manual
9
OVERVIEW
Preparing the table for operation requires completion of the following tasks:
•
Positioning the Table Base
•
Making the Electrical Connections
•
Alignment Procedures
•
Tabletop Assembly/Installation
•
Checking Table Operation
•
Installing the Covers
UNPACKING
Open crate or carton marked "packing list enclosed" first. Remove packing list and
use it as a guide to open the remaining cartons. Do not dispose of packing material
until packing list is matched with actual parts received. Should there be a shortage or
damage, notify Quantum Medical Imaging, LLC.’s customer service department imme-
diately. The manufacturer is relieved of any responsibility for damage during ship-
ment after unit is picked up by the carrier.
TABLE ASSEMBLY
The radiographic table is shipped with most of its major components assembled.
However, the tabletop assembly must be attached to the base assembly. After the
table is assembled, an operational check is performed. (This check is required only
on Model QT-750 Odyssey HF Series X-ray Generators.)
POSITIONING THE TABLE BASE
Place the table base in the approximate location where it will be mounted.
Ensure that the floor below the table is level. When positioning the table base,
ensure there is a minimum clearance of 87 inches from the outer edge of Bearing
Rail to the wall on either side of the table (see Figures 1 and 2). This allows for
installation of the tabletop rails following table mounting. If enough clearance is
provided, proceed to the "Electrical Connections" paragraph in this chapter.
If there is not enough clearance on either side to install the tabletop after the
table is mounted to the floor, the tabletop must be installed prior to mounting the
table. To install the tabletop, proceed to the paragraph entitled "Tabletop Assem-
bly/Installation" before performing the next procedure.
NOTE
Examine all car-
tons and crates
carefully at time
of delivery. If
damage is appar-
ent, have deliv-
ery driver write a
"Damaged Ship-
ment Note" on
copies of freight
bill, sign it, and
file appropriate
carrier claim.
Should you dis-
cover concealed
damage, immedi-
ately notify the
transporting
agent and ask
for an
"Inspection of
Damage". Carrier
will not accept
concealed dam-
age claim if filed
after 15 days
from date of
receipt of mer-
chandise.
Содержание QT-740
Страница 4: ...Revision History ii Models QT 740 QT 750 Service Manual THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 7: ...Chapter 1 1 SPECIFICATIONS...
Страница 8: ...2...
Страница 13: ...Chapter 7 2 ASSEMBLY INSTALLATION...
Страница 14: ...8...
Страница 29: ...Chapter 23 3 THEORY OF OPERATION...
Страница 30: ...24...
Страница 38: ...Chapter 3 Theory of Operation 32 Models QT 740 QT 750 Service Manual THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 39: ...Chapter 33 4 SERVICE INSTRUCTIONS...
Страница 40: ...34...
Страница 57: ...Chapter 4 Service Instructions 51 Models QT 740 QT 750 Service Manual...
Страница 58: ...Chapter 51 5 DIAGRAMS...
Страница 59: ...52...
Страница 62: ...Chapter 5 Diagrams Models QT 740 QT 750 Service Manual 55 Figure 28 4 Way Table Control Board A1 AY40 017T...