Chapter 6 Fibre Channel Management
Cabling the FC420s to the PMC
64
MC300 Prism Management Card User’s Guide
Figure 27 Cabling for
Two or More FC420s
in an ATL M2500
Stack
Note:
You will need one hub/switch port for the PMC and one
hub/switch port for each FC420 bridge. If your hub/
switch does not have enough ports, you can connect the
uplink port of a second hub/switch to one of the
standard ports on the primary hub/switch to provide
more ports.
100Mbit/second
Ethernet hub/switch
Ethernet cables and hub/switches are not supplied,
other standard cabling not shown for clarity
For close up of the MC300 PMC and the FC420
bridge, see the “Cabling for a Single FC420 in
an ATL M2500” illustration
Содержание MC300 Prism
Страница 1: ...MC300 Prism Management Card User s Guide 6311631 10 Ver 10 Rel 0...
Страница 44: ...Chapter 3 ALERT SNMP SNMP Community Management 28 MC300 Prism Management Card User s Guide...
Страница 74: ...Chapter 5 ALERT Library Management Event History Page 58 MC300 Prism Management Card User s Guide...
Страница 94: ...Chapter 6 Fibre Channel Management Bridge Administration 78 MC300 Prism Management Card User s Guide...
Страница 96: ...Chapter 7 Getting Help 80 MC300 Prism Management Card User s Guide Figure 32 Help...
Страница 132: ...Appendix B Battery Statements 116 MC300 Prism Management Card User s Guide...