3
Installing the Library
XLS Library Site Planning Guide
3-31
An uninterruptible power source (UPS) is strongly recommended. Be sure the UPS is
rated to handle the peak power loads listed in
Table 3-13 on page 3-20
.
CAUTION
If equipment will be installed in the optional auxiliary equipment rack,
it must be connected to a separate power circuit.
3.4
Cooling Requirements
The XLS draws fresh cooling air through the grille and air filters on the front of the
library and exhausts warm air out the back. The BTUs/hour figures in
Table 3-13 on
page 3-20
, above, indicate the air conditioning capacity needed to remove the heat
generated by example XLS systems.
Содержание XLS Series
Страница 1: ...Site Planning Guide Document No 501604 Rev 07 01 19 XLS Series of Tape Libraries...
Страница 6: ...6 501604 Rev 07 01 19 Table of Contents...
Страница 14: ...1 1 About the XLS 1 8 501604 Rev 07 01 19 Figure 1 7 Two XLS 89000 MEMs attached to the XLS 832700...
Страница 38: ...3 4 Cooling Requirements 3 22 501604 Rev 07 01 19 Notes...
Страница 42: ...4 4 501604 Rev 07 01 19 Notes...