background image

page 4

 Always locate your base stations so that they have, as much as possible, clear line of sight in the area 

you want to cover. Any solid wall, doorway, fridge, plant room area or mezzanine floor in immediate 
proximity in front of the base station will reduce range.

 The base station must be positioned upright on the wall and secured with both attaching screws.

 The base should be located a minimum 3m (9ft) from floor level unless the ceiling is lower, in which 

case as high as you can.

In Network coverage A

, a single base is sufficient. The shading shows how the range of a single base 

covers the whole premises in this instance. 

In Network coverage B

, three bases are required to cover the three separate distinct areas. When 

planning the positioning of the bases there should be a 5m (15ft) overlap in the signal from two 
interconnecting bases to allow the headsets to switch between bases seamlessly. If the call drops 
when moving from one base to another, move them closer together by at least 5m.

Slave base station 2

Network coverage A - Small store layout

Network coverage B - Large store layout

Stock room

Staff  

room

Cash desks

Base station

Charger & headsets

Stock room/loading bay

Firewalls

Primary base station

Staff 

room

Plant 

room 

& prep 

area

Secondary base station

Network cable

Charger & headsets

Base station 

network coverage

Secondary base station

Содержание Pro10

Страница 1: ...Pro10 Headset System Installation Manual...

Страница 2: ...eadsets Step 2 Pre installation survey Step 3 Locating base stations Step 4 Conducting your range test page 5 Step 5 Positioning the registration point Installation Procedure Step 6 Installing base st...

Страница 3: ...errupted range coverage in all operational areas asked for by the client which may require the installation of more than one base station It s normal practice to exclude plant rooms lift shafts cold s...

Страница 4: ...gle base covers the whole premises in this instance In Network coverage B three bases are required to cover the three separate distinct areas When planning the positioning of the bases there should be...

Страница 5: ...chronised with the system which may take several seconds Then press the page button to talk and conduct a walk test you can hear yourself in the headset When the audio breaks up you re out of range Ei...

Страница 6: ...ion point over a maximum of 200 metres Cat5 cable length If your installation requires more than two bases plus the registration point a second 24hr continuous power supply should be provided in the l...

Страница 7: ...bases They show two green LEDs Step 8 Synchronising base stations As you connect the Cat5 cables to the bases they will power up and start to synchronise Their LEDs will turn AMBER and then RED GREEN...

Страница 8: ...cates that the headset is not registered One at a time hold each headset just in front of the registration point the flashing LED on the headset facing the registration point The registration point LE...

Страница 9: ...equencies and will need to be returned to your service provider Step 11 Testing the installation Once all headsets have been registered onto the system conduct a final full range test using 2 people w...

Страница 10: ...tery fitting and removal 1 The headset will ship without the battery inserted Unclip and remove the circular battery cover there are two small gaps to gently pry the cover off with your nail or a soft...

Страница 11: ...rmine whether it s a headset or battery fault Swap the battery from one in a working headset If changing the battery clears the fault then throw away the faulty battery and order a new one If not send...

Страница 12: ...ildigital com 13 Feb 2019 Appendix C Pro10 products and codes Pro10 Headset Q P10HS Pro10 Charger Q P10CH Pro10 Neckband Q P10NB Pro10 Base Station Q P10BS Pro10 Charger Shelf Q P10SHELF Pro10 Registr...

Отзывы: