CB1200-I PELLET STOVE SERVICE MANUAL
CB1200-I PELLET STOVE SERVICE MANUAL
POWER SUPPLY TROUBLE-SHOOTING
POWER IN
7 AMP FUSE
JUNCTION BOX
#3 SNAP DISC
POWER SUPPLY
BLACK
GREY
W
H
IT
E
GREEN
ACCY
JUMPER
1
3
4
5
6
2
WHITE
GREY
GREY
7-31-2002 PAGE 14 250-7700
1) CHECK FOR POWER AT THE BLACK WIRE FROM THE POWER CORD. (SEE FIG. 1)
A. IF NO POWER------CHECK OUTLET OR REPLACE POWER CORD
B. IF POWER IS PRESENT, CONTINUE TO STEP 2
2) CHECK FOR POWER AT THE GREY WIRE ON THE 7 AMP FUSE HOLDER. (SEE FIG. 2)
A. IF NO POWER------REPLACE THE FUSE OR THE FUSE HOLDER
B. IF POWER IS PRESENT, CONTINUE TO STEP 3
3) CHECK FOR POWER AT THE GREY WIRES ON SNAP DISC #3. (SEE FIG. 3)
A. IF NO POWER------RESET THE SNAP DISC OR REPLACE IT.
B. IF POWER IS PRESENT---CHECK FOR CONTINUITY AT PIN 5 (WHITE WIRE) TO POWER CORD
(FIG.4 & 5) OR REPLACE THE CONTROL BOX.
Содержание CB1200
Страница 30: ...CB1200 I PELLET STOVE SERVICE MANUAL ...