16 August, 2018
7038-248A
18
5700 Step Top AU Wood Appliance
Figure 18.1
NOTE:
The Ash Removal System, must be installed first
before installing the legs.
Included in Kit:
ARS door assembly, ARS latch assembly, Ash Removal
Box, Ash Removal Drawer, ARS Channel, ARS Cover, and
fastener package.
Tools Required:
7/16 socket wrench, 9/16 socket wrench, 3/8 open end
wrench, Phillips screw driver, and hammer.
ARS
Channel
ARS
Cover
Reinstall 3 front
bricks back into
firebox
Figure 18.2
B. Access Cover Handle
Insert Access Cover Handle handle into slot of ARS Cover
to remove ARS Cover for cleaning ash out of firebox
(Figure 18.2)
.
C. Leg Kit & Ash Removal System Installation
Finishing the ARS Installation
5.
Replace front 3 bricks that were removed in step 1
(Figure 18.1)
.
6.
Install the ash drawer to pedestal base.
7. Install ARS access cover inside of ARS Channel that is
located inside the firebox
(Figure 18.1)
.
Installing Queen Anne Leg ARS Kit
1. Follow
Beginning installing the ARS system
instructions provided on page 16.
2.
Install ARS Spacer on left hand side with one bolt using
Phillips head screwdriver
(Figure 17.4 on page 17)
.
3.
Install leg brackets and ash drawer using four screws
and Phillips head screwdriver:
-
Start bottom two bolts through ash drawer, leg
mount and into the bottom of the appliance
(Figure
18.3)
.
-
Align top holes and repeat; secure all four bolts.
4.
Install legs onto mounting brackets making sure the
legs are up against the bracket and secure with bolts
and washers using a 3/8 open end wrench
(Figure
19.1 on page 19)
.
5.
Install leveling bolts into 2 legs; these leveling legs
should be in opposite corners
(Figure 19.1 on page
19)
.
6. Carefully stand appliance up and place in desired
location.
7.
Use leveling bolts on legs to stabilize and level
appliance
(Figure 19.2 on page 19)
.
Figure 18.3
Lay appliance flat on
its back on protective
padding or pallet
Ash Removal Box
Leg Brackets
Insert 2 bottom screws loosely
Align top holes
and repeat; secure
CHECK BAFFLE BOARDS & CERAMIC BLANKET!
•
Verify that the baffle boards and ceramic blanket are
in their proper locations.
•
It is important that the baffle boards and ceramic
blanket are in correctly installed for proper burn
safety.
CAUTION