background image

October 12, 2015

7038-201D

Page  5

5700 Step Top ACC Wood Burner

CORNER POSITIONING (45°)

DESCRIPTION

Hawkwind Kit

Shall be Fitted

A

Min. clearance from 

fi

 rebox to corner walls

100mm

B

Depth of 

fl

 oor protector

1210mm

C

Min. distance from 

fi

 rebox opening to 

fl

 oor protector front

450mm

D

Min. distance from 

fi

 rebox to 

fl

 oor protector side

76mm

E

Width of 

fl

 oor protector

850mm

Minimum 

fl

 oor protector thickness

6mm

CORNER POSITIONING (45°)

Drawing not to scale

Table 2

Fig. 4

FIREBOX INSTALLATION

1.  If a separate 

fl

 oor protector is being used position now. Place the 

fi

 rebox on a 

fl

 oor protector that 

is at least 6mm thick to suit the minimum installation clearances. (See Fig 3 or 4).
2.  Seismically restrain the 

fi

 rebox and the 

fl

 oor protector to the 

fl

 oor.

3.  Fit 2 x 6mm 

fi

 xings suitable for the 

fl

 oor material. DO NOT over tighten.

4.  Fit timber trim pedestal edging to front and back of base (optional).

A

 

A

 

 

 

 

 

 

B

E

C

D

Содержание 57ST-ACC-AU

Страница 1: ...y Fig 3 4 and Table 1 2 relate to installations with tested flue systems as per AS NZS 2918 2001 Appen dix F with a ceiling angle between 0 30 inclusive For installations with a ceiling angle greater...

Страница 2: ...comfort of your hearth appliance Thank you for choosing Quadra Fire and Welcome to the Quadra Fire Family 5700 STEP TOP ACC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 2015 2016 2017 INSTALLATION...

Страница 3: ...TEP TOP ACC Wood Burner Dimensions Pedestal Model Quadra Fire 5700 STEP TOP ACC Wood Burner Dimensions Leg Model 33 mm 203 mm 662 mm 856 mm 89 mm 94 mm 699 mm 94 mm 686 mm 535 mm 280 mm 435 mm 379 mm...

Страница 4: ...y with the minimum Floor Protector requirements of AS NZS 2918 2001 Note The minimum Floor Protector sizes are specified in the clearance chart see Table 1 2 A Floor Protector can include ceramic tile...

Страница 5: ...loor protector 850mm Minimum floor protector thickness 6mm CORNER POSITIONING 45 Drawing not to scale Table 2 Fig 4 FIREBOX INSTALLATION 1 If a separate floor protector is being used position now Plac...

Страница 6: ...s 1 Starting a Fire and Reloading Open both controls fully by raising the Burn Rate Air Control all the way up until it stops and slide the Start Up Air Control back until it stops After loading the s...

Страница 7: ...able Solution from 01 07 05 5 Install the outer casing so that i lower end is flush with the underside of the ceiling material and ii with the addition of metal L brackets affix to the outer casing at...

Страница 8: ...een flue pipe casing combustible material Non combustible material Hebel block or 12mm Promina board or similar under the flashing 25 25 Approved Flashing Roof Line Inner Casing 200mm above roof line...

Страница 9: ...ig 4 6 downward distance of casing and 3 x flue distance of the ceiling plate ADD Cowl Casing Cover Spider Bracket Approved Flashing A Ceiling Plate Batten A 3 x flue pipe Ceiling flue pipe Fig 7 ADD...

Страница 10: ...ng the entral tongue to locate inside the flue outlet only Two tabs are provided and if folded back at 90 degrees the bracket and Flue Mounted Shield will mount lower onto the appliance The Flue Mount...

Страница 11: ...E FIRST INSTANCE CAUTION THIS APPLIANCE SHOULD NOT BE OPERATED WITH CRACKED AND BROKEN COMPONENTS e g GLASS PANELS OR CERAMIC TILES MAY RENDER THE INSTALLATION UNSAFE WARNING ANY MODIFICATION OF THE A...

Страница 12: ...Page 12 7038 201D October 12 2015 5700 Step Top ACC Wood Burner Service And Maintenance Log Date of Service Performed By Description of Service...

Страница 13: ...age under this manufacturer s warranty begins on the date of first occupancy of the dwelling or six months after the sale of the product by an independent authorized HHT dealer distributor whichever o...

Страница 14: ...not supplied with the appliance or any other components not expressly authorized and approved by HHT 8 modification of the appliance not expressly authorized and approved by HHT in writing and or 9 i...

Страница 15: ...rner Service Parts R 57ST ACC AU Beginning Manufacturing Date Nov 2012 Ending Manufacturing Date Active Step Top Wood Stove Advanced Combustion Control Part number list on following page 1 2 3 4 5 6 7...

Страница 16: ...Assembly SRV7038 001 8 Access Cover ARS SRV7038 196 9 Channel Ash Removal System ARS 7033 172 10 Tube Channel Rack SRV7038 174 11 Tube Channel Assembly SRV7038 008 Y 12 Secondary Tube Gasket 7038 187...

Страница 17: ...17 3 Brick 6 75 x 1 75 x 1 25 Qty 1 Req 17 4 Brick 9 x 2 75 x 1 25 Qty 2 Req 17 5 Brick 7 x 1 75 x 1 25 Qty 1 Req 17 6 Brick 6 75 x 4 5 x 1 25 Qty 4 Req 17 7 Brick 5 x 4 5 x 1 25 Qty 2 Req 17 8 Brick...

Страница 18: ...rm Assembly SRV7038 046 Door Gasket 7033 282 Y 27 8 Timer Only Replacement Assembly SRV480 1940 Y 27 9 Timer Arm Assembly 7033 034 Y 28 1 Pedestal Kit PED 5700 28 2 Ash Pan Pedestal Model w Door SRV70...

Страница 19: ...de model number and serial number when requesting service parts from your dealer or distributor Stocked at Depot ITEM DESCRIPTION COMMENTS PART NUMBER Component Pack Includes Owners Manual Access Cove...

Страница 20: ...aler phone Notes DO NOT DISCARD THIS MANUAL CAUTION Important operating and maintenance instruc tions included Leave this manual with party responsible for use and operation Read understand and follow...

Отзывы: