M000001   QTEK   DStacker   GS2   -­‐   INSTALLATION    OPERATIONS   MANUAL   May   2015

   

Page 4 of 4

 

 

 

OPERATING   INSTRUCTIONS:      

   

   

A

)   P

RIMING   THE   

P

ALLET   

M

AGAZINE

:

   

Priming    the    pallet    magazine    will    occur    when    initially    loading    the    DStacker    or    when    a    previous   

pallet   issue   has   necessitated   the   removal   of   the   entire   pallet   stack.   

1)         Using    a    forklift,    place    one    (1)    pallet    on    top    of    the    forks    and    go    into    the    DStacker    from    the   

bottom.   From   the   underside   raise   the   pallet   until   the   front   and   rear   latches   flip   up   past   the   top   

board.   The   latches    drop   inside   the    pallet’s   opening   between   the    top    and    bottom    boards.       Do   

not    raise    the    pallet    beyond    this    point.   

WARNING

:   

Contacting    the    front    two    latches    with    the   

forklift   during   this   step   can   result   in   damage   and   render   the   machine   inoperable.

   

2)         Using   a   forklift,   pick   up   one   (1)   pallet   with   the   forks   and   place   on   top   of   the   installed   pallet   
3)         Next,   load   a   straightened   stack   of   ten   (10)   pallets   into   the   magazine   making   sure   to   raise   the   

pallet   stack   above   the   black   base   pallet   guides   when   entering   the   unit.   

WARNING:   

To   prevent   

damage    to    the    DStacker    and    to    eliminate    dispensing    problems,    forklift    operators    must    ensure   

the   pallet   stacks   are   vertically   aligned   and   straightened   prior   to   being   loaded   into   the   machine.

   

4)         The   yellow   Pallet   Containment   Mechanism   (PCM),   located   on   each   side   along   the   leading   edge   

of    the    upper    pallet    magazine,    will    pivot    back    out    of    the    way    once    contacted    by    the    entering   

pallet    stack.    The    PCM    is    designed    to    prevent    the    pallet    stack    from    falling    forward    once    it    is   

loaded    into    the    pallet    magazine.    Ensure    the    10-­‐pallet    stack    is    touching    the    back    wall    before   

lowering   them   onto   the   pallets   currently   resting   on   the   latches.   

5)         Move   the   forklift   back   clear   of   the   Dstacker   and   not   allowing   access   to   the   pallets.   Hold   down   

the   priming   switch   for   3   seconds,   the   pallet   stack   will   start   to   slowly   descend   to   the   floor.   Once   

the   stack   is   on   the   floor,   the    latches   will   release   the   bottom   pallet,   rise   up   and   be    reinserted   

into   the   front   and   rear   openings   of   the   second   pallet.   The   Dstacker   is   now   in   a   safe   operable   

state.   

6)         Operator   should   finish   filling   the   rest   of   the   pallet   magazine   until   it   reaches   the   “Pallet   Height   

Limit”   indicator   at   the   top   of   the   machine.      

Do   not   overfill   machine.      

The   pallet   magazine   must   

not      exceed      the      maximum      number      of      pallets    as      indicated.            The      DStacker      is      now      ready      to   

operate.      

WARNING

:      

Operators   must   be   certain   the   pallets   do   not   touch   upper   support   cross   

braces   at   the   top   of   the   magazine   during   the   loading   process.

   

7)         Since      the      DStacker      requires      a      minimum      number      of      six      (6)      pallets      to      operate,      the      pallet   

magazine   should   be   reloaded   before   reaching   this   minimum   number   in   the   machine.   

   

B)   D

ISPENSING   

P

ALLETS   WITH   

W

ALKIE   

R

IDER

:

   

1)         Check   to   see   the   lifting   frame   is   in   dispensing   position   (latches   are   in   the   second   pallet.)   
2)         Drive   walkie   rider   into   bottom   pallet   until   the   backrest   is   1/2”   from   the   pallet   stack.   
3)         Raise   walkie   rider   to   its   full   height,   which   will   lift   the   entire   pallet   stack.   
4)         Lower   walkie   rider   forks   until   the   bottom   pallet   is   approximately   1”   off   the   floor.   
5)         Back   out   of   the   DStacker   to   dispense   the   pallet.      Once   the   pallet   has   passed   the   photo   eye   the   

pallet   magazine   will   descend   and   set   the   pallet   stack   on   the   ground.   It   will   reset   the   position   of   

the   latches   into   the   openings   of   the   next   pallet.    It   is   now   ready   to   repeat   the   process.   

6)         Replenish   the   pallet   magazine   anytime.      Do   not   allow   remaining   pallet   stack   to   go   below   the   top   

of   the   black   base.   

Содержание DStacker GS2

Страница 1: ...n 441 Industrial Road London Ontario Canada N5V 1T6 sales qtekdesign com 877 453 1880 Fax 519 451 3124 www qtekdesign com Operations Service Manual DStacker GS2 DStacker GS2 Part Serial Production Cod...

Страница 2: ...herwise the machine s functionality could be compromised 3 The site will require a minimum headroom clearance of 16 feet from the floor 4 The machine will require a minimum clearance around the unit a...

Страница 3: ...shipping brace 5 Install upper pallet magazine onto middle pallet magazine using forklift put 5 pallets into upper pallet magazine then lift upper pallet magazine and align onto middle pallet magazin...

Страница 4: ...hing the back wall before lowering them onto the pallets currently resting on the latches 5 Move the forklift back clear of the Dstacker and not allowing access to the pallets Hold down the priming sw...

Страница 5: ...ne is cleared operator must enable the PCM again by pressing inward on the PCM while releasing the Lock Out lanyard from the small black post Test the spring loaded PCM to verify that it is functionin...

Страница 6: ...chanisms Remove the pallet stack as per Section C from the DStacker chamber Manually push one of the four 4 latches inward The latches should offer some resistance and will return to the outward posit...

Страница 7: ...ad London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 7 of 7 MACHINE ASSEMBLY photo 1 1 2 3 4 4 5 5 6 7 7 7...

Страница 8: ...ndon Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 8 of 8 OPERATING INSTRUCTIONS photo 1A 1A 1A 2A 2A 3A 4A 5A...

Страница 9: ...Industrial Road London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 9 of 9 1C 2C 3C 1D 2D 3D 3D 3D 3D 3D 3D 3...

Отзывы: