SITE   REQUIREMENTS

   

   

F

ACILITY   

S

UPPLIED

:

   

1)         Electrical   Requirements:    120VDC   or   Solar   Option   

Pneumatic   Requirements:   

None

   

2)         The   installation   site   must   have   a   level   concrete   surface   otherwise   the   machine’s   functionality   

could   be   compromised.   

3)         The   site   will   require   a   minimum   headroom   clearance   of   16   feet   from   the   floor.   
4)         The   machine   will   require   a   minimum   clearance   around   the   unit   as   follows;   

 

Left   side,   right   side   and   rear   of   unit   –   24”   minimum

   

 

Front   access   clearance   –   96”   minimum

   

5)         A   forklift   (minimum   5000   lbs   lifting   capacity)   with   a   vertical   reach   of   12   feet”.   

   

T

OOLS   

R

EQUIRED

:

   

 

Hammer   drill   with   a   3/4”   &   5/8”   drill   bit   capable   of   drilling   a   minimum   depth   of   6”

   

 

Heavy   hammer

   

 

Set   of   wrenches   (1/2",   9/16”   and   3/4")

   

 

Utility   knife

   

 

Step   Ladder   –   6   ft.

   

Содержание DStacker GS2

Страница 1: ...n 441 Industrial Road London Ontario Canada N5V 1T6 sales qtekdesign com 877 453 1880 Fax 519 451 3124 www qtekdesign com Operations Service Manual DStacker GS2 DStacker GS2 Part Serial Production Cod...

Страница 2: ...herwise the machine s functionality could be compromised 3 The site will require a minimum headroom clearance of 16 feet from the floor 4 The machine will require a minimum clearance around the unit a...

Страница 3: ...shipping brace 5 Install upper pallet magazine onto middle pallet magazine using forklift put 5 pallets into upper pallet magazine then lift upper pallet magazine and align onto middle pallet magazin...

Страница 4: ...hing the back wall before lowering them onto the pallets currently resting on the latches 5 Move the forklift back clear of the Dstacker and not allowing access to the pallets Hold down the priming sw...

Страница 5: ...ne is cleared operator must enable the PCM again by pressing inward on the PCM while releasing the Lock Out lanyard from the small black post Test the spring loaded PCM to verify that it is functionin...

Страница 6: ...chanisms Remove the pallet stack as per Section C from the DStacker chamber Manually push one of the four 4 latches inward The latches should offer some resistance and will return to the outward posit...

Страница 7: ...ad London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 7 of 7 MACHINE ASSEMBLY photo 1 1 2 3 4 4 5 5 6 7 7 7...

Страница 8: ...ndon Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 8 of 8 OPERATING INSTRUCTIONS photo 1A 1A 1A 2A 2A 3A 4A 5A...

Страница 9: ...Industrial Road London Ontario L5V 1T6 Canada Service qtekdesign com www qtekdesign com M000001 QTEK DStacker GS2 INSTALLATION OPERATIONS MANUAL May 2015 Page 9 of 9 1C 2C 3C 1D 2D 3D 3D 3D 3D 3D 3D 3...

Отзывы: