Hardware installation manual
Qtech Platform 2U Server Product Technical Manual
51
www.qtech.ru
4.
CHAPTER 4 SYSTEM CABINET INSTALLATION
1.
Step 1. After removing the inner rail from the rail, push the middle rail into the rail
1.1.
Pull out the inner rail from the guide rail, and you can hear a click and stop
1.2.
Push the white button in the direction of the arrow while pulling out the inner rail
completely outwards
1.3.
Complete the removal of the inner rail
1.4.
Push a snap in the guide rail in the direction of the arrow
1.5.
Simultaneously pushing the middle rail into sliding rail
1.6.
Complete Step 1
2.
Step 2. Install the inner rail to the chassis (same as left and right inner rails, please repeat the
installation)
2.1.
Align the positioning holes of
the inner rail with the four hanging screws on
the side of the chassis, and install the inner rail to the chassis according to the diagram.
After the installation is completed, you can hear a click and need to be installed in place.
2.2.
At chassis a, lock the M4x4 screws in the accessories to chassis a. Complete step 2
Содержание 1U
Страница 1: ...HARDWARE INSTALLATION MANUAL www qtech ru QSRV RMC Platform Hardwareinstallationmanual 1 0...
Страница 51: ...Hardware installation manual Qtech Platform 2U Server Product Technical Manual 47 www qtech ru...
Страница 63: ...Hardware installation manual Qtech Platform 2U Server Product Technical Manual 59 www qtech ru 1 ACPI settings...