Page
14
of
30
6. PREPARATION FOR USE
Inspection
Prior to installing the ultrasonic processor, perform a visual inspection to detect any evidence of
damage, which might have occurred during shipment. Before disposing of any packaging
material, check it carefully for small items.
The ultrasonic processor was carefully packed and thoroughly inspected before leaving our
factory. The carrier, upon acceptance of the shipment, assumed responsibility for its safe
delivery. Claims for loss or damage sustained in transit must be submitted to the carrier.
If damage has occurred, contact your carrier within 48 hours of the delivery date.
Do not operate
damaged equipment
. Retain all packing materials for future shipment.
Electrical Requirements
The ultrasonic processor requires a fused, single phase 3-terminal grounding type electrical
outlet. For power requirements, check the label on the back of the unit.
Installing the Ultrasonic Processor
The ultrasonic processor should be installed in an area that is free from excessive dust, dirt,
explosive and corrosive fumes, and extremes of temperature and humidity. If processing
flammable liquids, use an approved fume hood and do not place the power supply in the fume
hood.
When positioning the unit, be sure to leave adequate space behind the unit so that all
connections can be easily disconnected.
WARNING
For your personal safety, do not, under any
circumstances, defeat the grounding feature of the
power cord by removing the grounding prong.
Содержание Sonicator Q500
Страница 2: ...Page 2 of 30 ...