12 ©
Copyright 2016 QSAN Technology, Inc. All Right Reserved.
Figure 3-3
Second Step of the Rail Kit Installation
Fourth Step of the Rail Kit Installation
。
Pull the middle member fully extended in locked position.
。
Ensure ball bearing retainer is located at the front of the middle member.
。
Insert chassis into middle-outer member.
。
When hitting the stop, pull/push release tab to unlock and retract chassis into rack.
。
Use M5*20 screws to fasten the chassis ear.
Figure 3-4
Fourth Step of the Rail Kit Installation
3.3.
Removing a Disk Drive Tray
Figures and the table that immediately follow provide descriptions of each component on the
front side of the LFF and SFF disk drive tray.