TissueLyser II User Manual 05/2016
28
CAUTION
Damage to instrument
Operation of the TissueLyser II at a temperature and humidity outside the range specified
may lead to damage to its electronic and mechanical components as well as a reduction in
instrument performance.
Power requirements
The power line to the TissueLyser II should be voltage-regulated and surge-protected. Make sure
that the voltage rating of the TissueLyser II (see the plate on the back of the instrument) is
compatible with the AC voltage available at the installation site.
Grounding requirements
To protect operating personnel, the National Electrical Manufacturers Association (NEMA)
recommends that the TissueLyser II be correctly grounded (earthed). The instrument should be
plugged into an AC power outlet that has a ground (earth) connection.
Transporting and repacking the TissueLyser II
Carry the TissueLyser II with both hands below the base of the instrument.
Please retain all original packaging for the duration of the warranty period and beyond. A
charge may be incurred in the event of damage during shipment if the original packaging is not
used for the return of the TissueLyser II to QIAGEN for repair.
CAUTION
Damage to instrument
Transport of the TissueLyser II using packaging other than the original packaging may lead
to instrument damage.
Before returning the TissueLyser II for repair, please contact QIAGEN to request a “Declaration of
Decontamination” form. After completing and signing this form, place it in an envelope which
should then be attached to the external surface of the cardboard container. In addition, place a
copy of the form inside the container.
To repack the TissueLyser II, first reinstall the transport security device using the two original
screws supplied with the instrument (for details, see “Installation Requirements
,
” page 26). Then
return the TissueLyser II to its original packaging by following the unpacking steps in reverse
order.