Operating Procedures
PyroMark Q96 ID User Manual 01/2016
5-11
3.
Switch on the vacuum pump.
4.
Apply vacuum to the tool by opening the vacuum switch.
5.
Wash the filter probes by lowering the probes into high-
purity water (Parking Position). Flush the probes with 180
ml high-purity water.
Ensure that the water is being transferred to the waste
container. If it is not, ensure the tubing is connected
correctly and is not broken. Broken tubing should be
replaced, see Section 7.9.
Ensure that the tubing is connected properly and there is
no leakage.
6.
Refill Parking Position with 180 ml high-purity water.
7.
Close the vacuum switch on the worktable (Off) and
place the tool in the Parking Position.
8.
Add 40 µl of 0.4 µM sequencing primer in Annealing
Buffer to each well of the PyroMark Q96 Plate Low that is
to be used.
Содержание PyroMark Q96 ID
Страница 1: ...Version 5 January 2016 Sample Assay Technologies PyroMark Q96 ID User Manual...
Страница 2: ......
Страница 8: ...Contents Contents 6 PyroMark Q96 ID User Manual 01 2016 This page intentionally left blank...
Страница 14: ...Safety Information 1 6 PyroMark Q96 ID User Manual 01 2016 This page intentionally left blank...
Страница 32: ...Installation Procedures 4 6 PyroMark Q96 ID User Manual 01 2016 This page intentionally left blank...
Страница 58: ...Operating Procedures 5 26 PyroMark Q96 ID User Manual 01 2016 This page intentionally left blank...
Страница 78: ...Maintenance 7 12 PyroMark Q96 ID User Manual 01 2016 This page intentionally left blank...
Страница 96: ...Appendix A A 8 PyroMark Q96 ID User Manual 01 2016 This page intentionally left blank...
Страница 106: ...Appendix C C 2 PyroMark Q96 ID User Manual 01 2016 This page intentionally left blank...
Страница 114: ...Appendix D D 8 PyroMark Q96 ID User Manual 01 2016 This page intentionally left blank...
Страница 122: ...Appendix E E 8 PyroMark Q96 ID User Manual 01 2016 This page intentionally left blank...
Страница 125: ......
Страница 126: ...1100446 01 2016 Sample Assay Technologies...