background image

11

5. Installation of Post Purge Safety Limit

 

The electricity to the boiler shall come from a dedicated breaker in the electric service 

box. A service switch should be mounted on the side of the boiler so the burner technician can 

service the burner and controls. The electrical wiring should be routed so as not to interfere 

with normal servicing of the boiler. Wiring done in the field between devices not attached to 

boiler shall conform with the temperature limitations for type T wire (63F/35C) or other specified 

wire as applicable when installed in accordance to manufacturer's instructions and wiring 

diagrams.

 

If an external electrical source is utilized, the boiler, when installed, must be electrically 

bonded to ground in accordance with the requirements of the authority having jurisdiction 

or , in the absence of such requirements, with the National Electrical Code, ANSI/NFPA 70 or 

Canadian Electrical Code Part I,CSA C22.1, Electrical Code.

 

The Post Purge Immersion Limit is installed to ensure that if the boiler exceeds 220° F, all 

power is disconnected to the burner.  The Limit should be mounted on the supply side of the 

boiler into the supplied tee.  To wire the post purge Limit please refer to the schematics for your 

specific burner on the following pages. 

Note:

Use one of these 

3/4 tappings for the 

immersion sensor.

Use supplied 

3/4”x 1/2” bushing.

Note:

Install immersion 

sensor in the 

supplied tee. 

Supplied high limit 

immersion sensor 

MUST

 

be installed on all direct 

vent applications

See wiring diagrams 

on pg. 19-20 for correct 

wiring.

 

Saint Roch Universal Boiler

Biasi B10 Boiler

Содержание Direct Vent DVF-4 Rigid

Страница 1: ...low the gas supplier s instructions If you can not reach your gas supplier call the fire department Installation and service must be performed by a qualified licensed installer service agency or the g...

Страница 2: ...nt Kit Gas or Oil DVF 4 Rigid Vent Kit and Installation 4 9 DVF 4 Installation of Make Up Air 4 1 10 DVF 4 Installation of Exhaust Termination 4 2 10 DVF 4 Joint Assembly 3 3 8 DVF 4 Appliance Connect...

Страница 3: ...l fire hazards Please read the literature and warranties supplied by the manufacturers of the various accessory equipment This equipment is warranted by the respective manufacturers not by Quincy Hydr...

Страница 4: ...with those of influenza and the highest incidence of poisoning occurs at the onset of cold weather or during flu season A victim may not experience any symptoms only one symptom or a few symptoms Susp...

Страница 5: ...ce technician or gas supplier DO NOT ATTEMPT TO START THE BURNER WHEN EXCESS GAS HAS ACCUMULATED WHEN THE UNIT IS FULL OF VAPOR OR WHEN THE COMBUSTION CHAMBER IS VERY HOT NOTE ALWAYS KEEP THE MANUAL F...

Страница 6: ...Vent hood shall be installed 12 above ground level or 12 above nominal snow level of the region of the installation which ever is higher 2 The Vent hood shall not be less than 3 feet above any forced...

Страница 7: ...3 DVO Flexible Vent Kit and Installation Vent Installation 1 Vent Pipe bend radius is 12 minimum 2 Support vent pipe with metal strapping every 36 3 Maximum wall thickness is 14 Call Z Flex for recom...

Страница 8: ...From outside the building insert the outer section through the wall until it rests against the wall Position the outer section so that the air intake is on the bottom Secure to outer wall using four...

Страница 9: ...und the flue collar and slide on adaptor and tighten gear clamp 4 Seal the seam on the adaptor 5 Slide the terminal inner section over the terminal outer section and secure by tightening the gear clam...

Страница 10: ...on to the outer sleeve to complete the joint assembly 3 3 DVO Joint Assembly APPLIANCE CONNECTION 1 Connect the appliance adapter to the appliance collas as per joint assembly 2 Apply Sealant around...

Страница 11: ...e provisions do not exist for the ducting of combustion products to the outside The direct vent connector shall not pass through any floor or ceiling The burner exhaust must be ducted directly to the...

Страница 12: ...s been determined cut a 8 hole for a non combustible wall or a 9 hole for a combustible wall Using 2 X 2 Frame a box around the hole on the outside of the house so the flange is mounted away from the...

Страница 13: ...electrically bonded to ground in accordance with the requirements of the authority having jurisdiction or in the absence of such requirements with the National Electrical Code ANSI NFPA 70 or Canadian...

Страница 14: ...hould be set to 12 5 CO2 To ensure proper burner setup gauges should be used to check things such as the pump pressure CO2 levels CO levels etc Gas 1 Checking the electrode orifice size and flame rod...

Страница 15: ...er Model EZ Select EZ Select EZ Select EZ Select Firing Rate 50 78 1 06 1 33 Insertion Depth 3 0 3 0 3 0 3 0 Nozzle 40x45 65X70 85X60 1 00X60 Spray Pattern A A A B Pump Pressure 155 psi 150 psi 150 ps...

Страница 16: ...am and controls To determine how much gas is coming into the burner or to set the gas meter correctly the following formula can be used The chart to the right can be used to determine the flow rate de...

Страница 17: ...r the tee before the combination gas valve When installing the boiler make sure a pipe compound resistant to the action of liquefied petroleum is used Check piping for leaks Always check leaks with a...

Страница 18: ...16 8 Wiring Oil Burners NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors...

Страница 19: ...17 9 Wiring Gas Burners NOTE All wiring must be done in accordance with applicable state local and national codes Use only copper conductors...

Страница 20: ...n to inspect the appliance and to replace any part of the control system and any gas control which has been under water OPERATING INSTRUCTIONS 1 STOP Read the safety information above 2 Set thermostat...

Страница 21: ...er of any debris with brush and vacuum 4 Remove smoke pipe and clean out debris from cleaning or soot build up 5 Inspect smoke pipe for any corrosion before reinstalling Replace if necessary 6 Consult...

Страница 22: ...mp Room Temp Ambient Net Stack Temp CO2 O2 Smoke Reading Combustion EFF System Checklist Boiler Model Serial Original Purchaser Installer Burner Checklist Burner Manufacturer Burner Fuel Type Burner M...

Страница 23: ...21 13 Installer Notes Continued Comments Notes...

Страница 24: ...HVAC products sold to wholesale distributors in the U S and Canada Customer service and support are the key to QHT s business From troubleshooting radiator piping to working through problems with wal...

Отзывы: