English
37
Appendix A Commissioning Report
Installer Information
End User Information
Name :
Name :
Phone :
Phone :
Address :
Address :
Commissioning Report (1/2)
Home ID (9 digits)
:
Q.HOME (Q.VOLT) S/N (18 digits)
:
Home ID (9 digits) provided to end user? :
Yes / No
PIN Code (4 digits) provided to end user? :
Yes / No
Server registration successfully completed?
:
Yes / No
Use precautions explained to end user?
:
Yes / No
Precautions
■
If the ESS cannot remain connected to grid AC power after commissioning, the PV Switch
on the Q.VOLT and the Battery DC Switch on the Q.SAVE must be switched OFF in order to
avoid any damage to the Battery Pack.
■
In case you install more than two Q.SAVEs to one Q.VOLT, make sure to plug a BMS
Communication Cable to the “OUT” terminal on the Q.SAVE for Q.VOLT connection, and plug
another cable to the “IN” terminal for the next Q.SAVE connection.
■
Make sure to complete all configurations before switching ON the PV Switch and the Battery
DC Switch for safety.
Please, go to the next page
Do You Have Any Comments?
Installer Signature
End User Signature
Date :
Date :
Signature :
Signature :
Содержание Q.HOME CORE H4
Страница 1: ...INSTALLATION QUICK GUIDE Q HOME CORE H4 A4 English Fran ais Deutsch...
Страница 34: ...English 34 5 Set network 6 Check firmware update 7 Check region and time 8 Set system parameters...
Страница 40: ...English 40 MEMO...
Страница 41: ...GUIDE D INSTALLATION RAPIDE Q HOME CORE H4 A4 Fran ais...
Страница 80: ...Fran ais 80 MEMO...
Страница 81: ...INSTALLATIONS KURZANLEITUNG Q HOME CORE H4 A4 Deutsch...
Страница 114: ...Deutsch 114 5 Netzwerk einstellen 6 Auf Firmware Update pr fen 7 Region und Uhrzeit pr fen 8 Systemparameter festlegen...