8
9
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.2 – Q CELLS
INSTALLATION AND OPERATION MANUAL SOLAR MODULES Q.PEAK DUO XL-G9.2 – Q CELLS
Specifications
MODULE TYPE
MOUNTING
OPTION
POSITION OF
CLAMPS* [MM]
TEST LOAD
PUSH / PULL** [PA]
DESIGN LOAD
PUSH / PULL** [PA]
SAFETY
FACTOR
Q.PEAK DUO XL-G9.2 CL1a
300 - 550
5400 / 2400
3600 / 1600
1.5
FB1
427.5
FB2
427.5
3600 / 2400
2400 / 1600
CL3
300 - 550
IP1
-
CL1b
300 - 550
3000 / 2400
2000 / 1600
Ä
The below mounting options are only possible under certain conditions.
MODULE TYPE
MOUNTING
OPTION
POSITION OF
CLAMPS* [MM]
TEST LOAD
PUSH / PULL***
[PA]
DESIGN LOAD
PUSH / PULL***
[PA]
SAFETY
FACTOR
Q.PEAK DUO XL-G9.2 TB1
881.5
2400 / 2200
1600 / 1460
1.5
TC1
881.5 - 931.5
2400 / 1600
1600 / 1060
*
**
***
Distance between outer edge of module and middle of the clamp (see table „2.3 Mounting Options“ on page 7); consider further details
below.
Loads according to IEC 61215-2:2016.
Test procedure according to IEC 61215-2:2016. Loads for these mounting options do not fulfill the requirements of the standards.
ATTENTION
Ä
The loads in the table are related to the mechanical stability of the solar modules. The mechanical stability of the mounting
system including clamps has to be evaluated by the system supplier. The listed test load values for Q CELLS were determinded
with the following clamp parameters: clamp width = 40 mm and clamp depth = 10 mm. The system installer is responsible for
the determination of location-specific load requirements.
Ä
Ensure, that the subconstruction does not touch the junction box (even under load). The clamps or insertion profiles etc. must
also not touch the glass (even under load).
Ä
CL1b: Using of short mounting rails are permissible. Minimum height of the short mounting rails should be ≥ 20 mm (clearance
between frame bottom edge and roof top).
Ä
Ensure, that the junction box’s connection cables do not run between the laminate and the mounting rails.
Ä
A minimum support depth of 15 mm is required on the back side of the module for IP1 and CL3. Ensure minimum support
depth of 10 mm on the front side of the module for IP1.
Ä
For CL1a and CL3 with rails: Ensure that the module frame is fixed directly on the rail of the substructure (no spacer allowed
between the module and substructure).
Ä
The module bends under loads. Therefore, sharp objects (e.g. screws) must not be mounted near the module backside.
Ä
Use M8 corrosion-proof screws and washers (diameter ≥ 15.8 mm) for FB1 and FB2 mounting. Mounting screws and washers
should have the same material properties.
2 PLANNING
2.3 MOUNTING OPTIONS
2 PLANNING
2.3 MOUNTING OPTIONS
TYPE OF
INSTALLATION
MODULE
POINT MOUNTING SYSTEM
LINEAR MOUNTING SYSTEM
TRACKER
INSTALLATION
ON MOUNTING
POINTS
Q.PEAK DUO XL-G9.2
TRACKER
INSTALLATION
WITH CLAMPS
Q.PEAK DUO XL-G9.2
TB1
881.5
EN
TC1
881.5 -
931.5
EN