Installation Guide / SolarRoof
4
Code-Compliant Planning and Installation Guide V 1.0 (New Zealand) - Complying with AS/NZS 1170.2-2021 -
- Planning -
For installation sites located in Sub-alpine Regions (shown on the map below), please refer to Note 26 of engineering
certificate for maximum interface spacing and see “Examples” in certificate to understand how to use maximum
spacing in Sub-alpine Regions.
If your installation site is in Alpine regions, please contact Clenergy to obtain a project specific engineering certificate
to support your installation.
Locations of New Zealand lee Zones