
Plumbing System
5-1
Section 5
DC235 / DC265
Plumbing System
5.1 Fresh Water System
General
The fresh water system consists of a potable
water tank, distribution lines and a distribu-
tion pump. The pump is equipped with an
automatic pressure switch and is located in
the forward storage compartment. An in-line
strainer located near the pump protects the
system from debris. The tank is filled
through a labeled deck fill located under the
baitwell hatch.
DO NOT confuse other deck fill with fresh
water fill. If toxic fluids or fuel is added to
fresh water tank, the system will be contami-
nated. DO NOT attempt to pump fuel out;
this system is not designed to pump fuel.
Fuel must be removed by qualified person-
nel only. Fuel in the fresh water systems will
also require replacement of that system and/
or many components.
Operation
Fill the water supply tank slowly through the
FRESH WATER FILL deck plate. After filling
tank, partially open all faucets. Turn on
“Fresh Water System” switch at the helm.
Allow the pump to run until all of the air is
purged from the system and a steady stream
of water is flowing from each outlet. Next,
turn off the faucets one by one. As the pres-
sure builds, the pump will automatically shut
off.
When properly primed and activated, the
water system will operate like the water sys-
tem in a home. An automatic pressure sen-
sor keeps the system pressurized. If the
system has been recently filled or has not
been used for an extended period, air may
accumulate at the pump and the system
may have to be re-primed.
Whenever the boat is left unattended, turn
the fresh water system switch "OFF."
5.2 Raw Water Washdown
DC 235
The raw water wash down fitting is supplied
raw water by the livewell pump.
Operation
To use the raw water washdown, turn on the
livewell, close the diverter valve that is part
of the livewell inlet. Raw water will be
directed to the fitting. As pressure builds in
the washdown hose the pressure switch on
the livewell pump will open causing the
pump to turn off. When the washdown hose
is in use, the pressure will drop and the
pump will turn on. Open the livewell diverter
valve when the washdown hose is not in use
or turn off the livewell pump if the livewell in
not in use.
!
DANGER
FIRE OR EXPLOSION HAZARD
Fuel and their vapors are highly explo-
sive when exposed to open flame or
spark, resulting in death or serious
injury. Do not confuse deck fills.
!
CAUTION
DO NOT allow the fresh water pump to
run dry; damage to the pump can
occur. The fresh water pump works on
demand and WILL NOT shut off when
the tank is empty. Turn the water
pump switch "OFF" when the system
is not in use. Operating any pump
from a low-charged battery can lead to
a pump failure. Keep the batteries
properly charged. The fresh water
system must be properly winterized
prior to winter lay-up. Refer to Winter-
izing.
Содержание DC / 265
Страница 12: ...8 Operator Notes DC265...
Страница 16: ...Operator Notes 12 DC235 DC265...
Страница 26: ...Operator Notes 2 6 DC235 DC265...
Страница 44: ...6 2 Operator Notes DC235 DC265...
Страница 50: ...7 6 Operator Notes DC235 DC265...
Страница 84: ...12 6 Operator Notes DC235 DC265...
Страница 90: ...Operator Notes A 6 DC235 DC265...
Страница 92: ...Appendix B Maintenance Log Date Hours Dealer Service Repairs B 2 DC235 DC265 Maintenance Log...
Страница 93: ...Maintenance Log B 3 Appendix B DC235 DC265 Date Hours Dealer Service Repairs...
Страница 94: ...Appendix B Maintenance Log Date Hours Dealer Service Repairs B 4 DC235 DC265...
Страница 95: ...Boating Accident Report C 1 Appendix C DC235 DC265 Boating Accident Report...
Страница 96: ...C 2 Appendix C Boating Accident Report DC235 DC265...
Страница 97: ...Float Plan D 1 Appendix D DC235 DC265 Float Plan...
Страница 98: ...Operator Notes D 2 DC235 DC265...
Страница 102: ...Operator Notes E 4 DC235 DC265...
Страница 103: ...Schematics F 1 Appendix F DC235 DC265 Schematics DC235...
Страница 104: ...F 2 Appendix F Schematics DC235 DC265...
Страница 105: ...Schematics F 3 Appendix F DC235 DC265...
Страница 106: ...F 4 Appendix F Schematics DC235 DC265...
Страница 107: ...Schematics G 1 Appendix G DC235 DC265 Schematics DC265...
Страница 108: ...G 2 Appendix G Schematics DC235 DC265...
Страница 109: ...Schematics G 3 Appendix G DC235 DC265...
Страница 110: ...G 4 Appendix G Schematics DC235 DC265...
Страница 111: ...Schematics G 5 Appendix G DC235 DC265...
Страница 112: ...G 6 Appendix G Schematics DC235 DC265...
Страница 113: ...Schematics G 7 Appendix G DC235 DC265...
Страница 114: ...G 8 Appendix G Schematics DC235 DC265...
Страница 115: ...Schematics G 9 Appendix G DC235 DC265...
Страница 116: ...G 10 Appendix G Schematics DC235 DC265...
Страница 117: ...Schematics G 11 Appendix G DC235 DC265...
Страница 118: ...G 12 Appendix G Schematics DC235 DC265...
Страница 119: ...Schematics G 13 Appendix G DC235 DC265...
Страница 120: ...Operator Notes G 14 DC235 DC265...
Страница 121: ......
Страница 122: ......