PureAire Monitoring Systems, Inc.
2/22/2000
22
11.
Place the retainer ring over the membrane and then place the box nut over the retainer ring. Turn box
nut clockwise until hand tight; continue tightening until the box nut can no longer be moved by hand
.
CAUTION:
Sensor cell response will be affected if box nut is too loose.
Box Nut
Mmebrane
Retainer
Ring
Membrane
12.
Turn the cell to the proper monitoring direction, (Box Nut is facing down) and confirm that the level
of electrolyte is at the MAX mark. It is OK if the level is slightly above or below the MAX mark.
Reinstall the sensor cell into the transmitter or duct.
NOTE:
When storing the sensor cell never store the sensor cell horizontal
with the Pressure Compensation Screw positioned down or store the
sensor cell upside down. This can cause the electrolyte to leak from
the sensor cell pressure compensation screw.
Содержание TX-KE
Страница 26: ...PureAire Monitoring Systems Inc 2 22 2000 25 ...