background image

www.pulsar.pl                                                             PSDCB18129B           

 

 

6

 

      Operating parameters (tab.6) 

Operating temperature 

-

10ºC...+40ºC (see: chart 1) 

Storage temperature 

-

20ºC...+60ºC 

Relative humidity 

20%...90%, without condensation 

Vibrations during operation 

unacceptable 

Impulse waves during operation 

unacceptable 

Direct insulation 

unacceptable 

Vibrations and impulse waves during transport 

According to PN-83/T-42106 

 

 

 

 

 

                         Chart 1. Acceptable output current from the PSU depending on ambient temperature. 

 
2. Installation. 

 

2.1 Requirements. 

The buffer PSU shall be mounted by a qualified installer with appropriate permissions and qualifications for 

230V/AC installations and low-voltage installations (required and necessary for a given country). The device shall 
be  mounted  in  confined  spaces,  according  to  the  environment  class  II,  with  normal  air  humidity  (RH=90%  max. 
without  condensation)  and  the  temperature  from  -

10°C  to  +40°C.  The  PSU  shall  work  in  a  vertical  position  that 

guarantees sufficient convectional air-flow through ventilating holes of the enclosure. 

 

                                 Before installation, prepare a PSU load balance: 

 

 

1. Output current 18x0,5A + 1A battery charge 

                                      2. Output current 18x0,38A + 4A battery charge 

 
                         Total device c battery: 11A max

*

 
As the PSU is designed for a continuous operation and is not equipped with a power-switch, therefore an 

appropriate  overload  protection  shall  be  guaranteed  in  the  power  supply  circuit.  Moreover,  the  user  shall  be 
informed  about  the  method  of  unplugging  (usually  through  assigning  an  appropriate  fuse  in  the  fuse-box).  The 
electrical system shall follow valid standards and regulations. 
 
 

2.2 Installation procedure. 

 

1. Before installation, cut off the voltage in the 230V power-supply circuit.

 

2. Mount the PSU in a selected location and connect the wires. 
3. Connect the power cables (~230VAC) to L-N clips of the PSU. Connect the ground wire to the clip marked by the 
earth symbol PE (PSU module connector). Use a three-core cable (with a yellow and green PE protection wire) to 
make the connection. Lead the cables to the appropriate clips through the insulating bushing of the connection 
board. 
 
 
 

                                                 

*

 

Refer to chart 1

 

Содержание PSDCB18129B

Страница 1: ...PSDCB18129B v 1 0 PSDCB 13 8V 9A 18x0 5A 7Ah Buffer switch mode power supply for CCTV EN Edition 4 from 16 12 2014 Supercedes the edition 3 from 28 05 2014 GREEN POWER CCTV...

Страница 2: ...ectors 1 4 Specifications 2 Installation 2 1 Requirements 2 2 Installation procedure 3 Operating status indication 3 1 LED indication of operating status 4 Operation and use 4 1 Overload or short circ...

Страница 3: ...3 Description of PSU components Table 1 Elements and connectors of the fuse block tab 1 fig 2 Element no fig 2 Description 1 F1 F9 glass fuses PTC 2 LED L1 L9 signaling presence of output voltage DC...

Страница 4: ...nt 5 BAT GND battery outputs BAT red GND black 6 TAMPER contact of sabotage protection NC 7 Additional connector for LED indication 8 Ibat Selection jumper for charging current Ibat 1A Ibat 4A Legend...

Страница 5: ...icroswitch NC contacts enclosure closed 0 5A 50V DC max LED indication AC diode indicating AC power status AUX diode indicating DC power status at the PSU output red normal status on failure off green...

Страница 6: ...convectional air flow through ventilating holes of the enclosure Before installation prepare a PSU load balance 1 Output current 18x0 5A 1A battery charge 2 Output current 18x0 38A 4A battery charge...

Страница 7: ...indication of operating status The PSU is equipped with two diodes on the front panel 4 Operation and use 4 1 Overload or short circuit of the PSU output SCP on The AUX1 AUX9 PSU outputs of the LB9 A...

Страница 8: ...ays from the delivery to the service centre of the manufacturer 6 The repair period mentioned in item 5 may be prolonged if there are no technical possibilities to carry out the repairs or if the equi...

Отзывы: