Pulsar BLACK POWER PSBEN 2012C Скачать руководство пользователя страница 16

www.pulsar.pl   

 

 

 

PSBEN2012C   

 

 

 

 
 

16 

7. Installation. 

 

7.1 Requirements. 
The buffer PSU is to be mounted  by a qualified installer, holding relevant permits and licenses (applicable 

and  required  for  a  given  country)  for  230V/AC  interference  and  low-voltage  installations.  The  unit  should  be 
mounted in confined spaces, in accordance with the II environmental class, with normal relative humidity (RH=90% 
maximum, without condensation) and temperature from -10°C to +40°C. The PSU shall work in a vertical p osition 
that guarantees sufficient convectional air-flow through ventilating holes of the enclosure. 

As the PSU is designed for a continuous operation and is not equipped with a power-switch, therefore an 

appropriate overload protection shall be guaranteed in the power supply circuit. Moreover, the user shall be 
informed about the method of unplugging (most frequently through separating and assigning an appropriate fuse in 
the fuse-box). The electrical system shall follow valid standards and regulations. 
 
 

7.2 Installation procedure. 

 

 

CAUTION! 
Before installation, cut off the voltage in the 230V power-supply circuit. 
To switch off power use an external switch in which the distance between the contacts of all poles in the 
disconnection state is not less than 3mm. 

 

1.  Mount  the  PSU  in  a  selected  location.  It  is  crucial  to  bolt  the  tamper  grip  to  the  mounting  surface.  The  grip  is 
located  in  the  central  part  of  the  enclosure  (see  fig.  3  [7])  and  guarantees  indication  in  case  of  any  attempts  of 
detaching  the  device  from  the  mounting  surface.  Proper  installation  is  one  of  the  requirements  of  the  PN-EN 
50131-6 standard.  

                                  

 

Fig. 15. Fixing a tamper grip. 

 
2. Connect the power cables (~230Vac) to L-N terminals of the PSU. Connect the ground wire to the terminal 
marked by the earth symbol: PE. Use a three-core cable (with a yellow and green PE protection wire) to make the 
connection. Lead the cables to the appropriate terminals through the insulating bushing. 
 

The shock protection circuit shall be performed with a particular care, i.e. the yellow and green wire coat 
of  the  power  cable  shall  stick  to  one  side  of  the  terminal  -  marked  with  the  PE  symbol  on  the  PSU 
enclosure. Operation of the PSU without the properly made and fully operational shock protection circuit 
is UNACCEPTABLE! It can cause a device failure or an electric shock. 

 
3. Connect the receivers’ cables to the +AUX, -AUX connectors of the terminal block on the PSU board. 
4. If necessary, connect the device’s leads to the technical inputs and outputs: 
 - EPS FLT; technical output of AC power loss indication (alarm panel, controller, indicator, etc.) 
 - PSU FLT; technical output of the PSU failure. 
 - APS FLT; technical output of the battery failure. 
 - TAMPER; output indicating enclosure opening or detaching from the assembly surface. 
 - EXT IN; collective failure output 
5. With the I

BAT

 jumper determine the maximum battery charging current, in accordance with the battery 

parameters. 
6. With the P

BAT

 jumper determine if the discharged battery disconnection system U<10V (+/-5%) shall be on or off. 

The battery protection is on when the P

BAT

 jumper is removed. 

7. Switch on the ~230V AC supply (red AC diode and green AUX diode should be lit). 

Содержание BLACK POWER PSBEN 2012C

Страница 1: ...PSBEN 2012C v 1 0 PSBEN 13 8V 2A 17Ah EN Buffer switched mode power supply unit EN Edition 3 from 20 11 2012 Supersedes the 2 from 14 09 2012 edition...

Страница 2: ...0 4 4 STANDBY TIME 11 4 5 BATTERY CHARGING TIME 11 4 6 OPERATION WITHOUT A BATTERY 11 5 REMOTE MONITORING OPTION WI FI ETHERNET RS485 USB 12 5 1 COMMUNICATION IN WI FI WIRELESS NETWORK 12 5 2 COMMUNIC...

Страница 3: ...OVL acoustic indication of failure adjustable times indicating AC power failure technical inputs outputs with galvanic isolation collective failure input EXT IN EPS technical output indicating AC powe...

Страница 4: ...ource are reported to the Alarm Receiving Centre ARC in accordance with 9 2 PN EN 50131 1 Output voltage 0 28A 1 5A battery charge General use if the PSU is not mounted within an installation which is...

Страница 5: ...isted operation 5 pin activation of the acoustic indication indication on indication off Caption jumper on jumper off 6 VADJ potentiometer DC voltage adjustment 7 BUZER acoustic indicator 8 FBAT fuse...

Страница 6: ...L N 230V AC power connector PE connector 6 Battery connectors positive BAT red negative BAT black 7 Grip of tamper resistance Fig 3 The view of the PSU 3 Operating status indication 3 1 Control panel...

Страница 7: ...LED indicates battery failure green LED indicates power at the AUX output of the PSU three yellow LEDs indicate battery charging level Fig 5 Menu of the display FLt PSU fault memo 30 last events Io A...

Страница 8: ...tion Battery fault undercharged battery 3 2 signals per 10s battery assisted operation Low level of battery charge 4 Fast signals battery assisted operation The PSU will be disconnected due to the bat...

Страница 9: ...l If voltage appears at the EXT IN input it will cause generating a PSU failure storing the information about the event in the internal memo and sending the signal about the failure to the PSU FLT out...

Страница 10: ...is removed Caution Deactivating of the UVP function is not recommended since a deep discharge of the battery limits its capability of storing energy lowers its capacity and shortens its durability 4...

Страница 11: ...5A battery charge 4 5 Battery charging time The PSU has a battery circuit charged with direct current The current selection is done via IBAT jumpers The table below shows how long it takes to charge a...

Страница 12: ...ge of wireless communication is lack of additional cords and fast development or modification of the network s structure Fig 10 WI FI communication with the use of the WI FI INTW interface 5 2 Communi...

Страница 13: ...B TTL INTU needs to be used This interface allows direct connection between the computer and the PSU and it is recognisable by the operating system as a virtual COM port Fig 13 KUSB TTL communication...

Страница 14: ...eneral use Io 2A 0 2A battery charge Io 1 6A 0 6A battery charge Io 1 2A 1A battery charge Io 0 7A 1 5A battery charge Output voltage setting escalation and keeping time 20ms 30ms 10ms Output voltage...

Страница 15: ...an be led Convectional cooling Table 8 Operation safety Protection class PN EN 60950 1 2007 I first Protection grade PN EN 60529 2002 U IP20 Electrical strength of insulation between input network cir...

Страница 16: ...s of detaching the device from the mounting surface Proper installation is one of the requirements of the PN EN 50131 6 standard Fig 15 Fixing a tamper grip 2 Connect the power cables 230Vac to L N te...

Страница 17: ...ivers from damage The outputs will be battery powered The protection system is indicated by illuminating of the OVP red LED on the pcb board PSU FLT output status change into Hi Z high impedance by so...

Страница 18: ...voltage 14 7V F07 ON 2 flashes ON PSU FLT Too high battery voltage Battery voltage 14V F08 ON 3 flashes ON PSU FLT Battery charging circuit failure Too low output voltage of the PSU set 13V Fault in t...

Страница 19: ...ibilities to carry out the repairs or if the equipment has been conditionally accepted due to the breaking warranty terms by the claimant 7 All the services rendered by force of the warranty are carri...

Отзывы: