Automatic Polymer Makedown Systems 

 

Installation, Operation and Maintenance Manual 

72-910-APMDS-E Rev D 

 

Skid Layout and Components 

Page 

10

 

Installation 

Prior to attempting installation, familiarize yourself with the layout and components furnished with 
your Pulsafeeder Polymer Makedown System.  These vary from system to system – review the 
documentation supplied with your order.  Inspect your system for damage which may have occurred 
during transit.  If damage is discovered, immediately file a claim with the carrier and contact your 
Pulsafeeder distributor for any required replacement parts or components. 

 

All systems (and pumps) have been tested with water at the factory.   

 
 
 
 
 
 
Polymer Makedown Systems are to be floor-mounted only. Mounting holes are provided on the skid 
for floor mounting.  Securely attach skid and the day-tank to the floor, in a position to prevent falling 
or tipping.  
 
Securely attach the provided ¾” x ½” diameter x 10’ long tubing from the system’s Made-down 
Polymer Outlet to the Day-tank’s Made-down Polymer Inlet, on the hose barbs with the hose clamps 
provided; refer to Figure 1 on page 6. It is best to cut this tubing to the desired length prior to 
installation, and be sure to support the tubing adequately over its length as its weight will increase 
when filled with made-down polymer. 

 

Installation area should provide ease of access to skid components (and pumps) and the area should be 
kept free of clutter to enable safe operation and maintenance. 

 

Note that pumps/motors are designed for ambient temperatures of 104

O

F (40

O

C) 

maximum. 

It is preferable that skid systems (and pumps) be located out of direct sunlight.  If skid system is 
exposed to sunlight, provide protection for the pump/motor to prevent overheating and UV damage. 

 

Owner-Installed Piping/Tubing 

The next series of steps are the connection of your piping/tubing which include the neat polymer 
supply line and tank outlet for made-down polymer supply to the system.  
These are your responsibility. 
 
 
 
 

CAUTION

 

Some dosing chemicals will react with water, e.g., acids, polymers, etc.  Check MSDS 
for the chemical to be handled.  If adverse reaction with water is indicated, ensure that 
all portions of the skid piping, its components (and the pump) are free from water prior 
to filling skid system with chemical. 

!

CAUTION 

If skid is exposed to sunlight, use UV-resistant tubing. 

WARNING 

Ensure that for all piping, tubing, fittings and other appurtenances, their materials are 
compatible with the liquid to be pumped and the design is suitable for the pressures and 
temperatures of the application.  System design must ensure safety for operation and 
maintenance as well as for anyone who may be in proximity to the system. 
Failure to do so may result in damage to equipment, personal injury or death. 

Содержание Automatic Polymer Makedown Systems

Страница 1: ...Systems Standard Product Operations 27101 Airport Rd Punta Gorda FL 33982 Tel 941 575 3800 Tel 800 333 6677 Fax 941 575 4085 Fax 800 456 4085 spotech pulsa com www Pulsafeeder com Manufacturers of Qu...

Страница 2: ...the factory for inspection and repair All returns require a Return Authorization number to be issued by Pulsafeeder Parts purchased to correct a warranty issue may be credited after an examination of...

Страница 3: ...i Table of Contents Topic Page Introduction 4 Safety 5 Skid Layout and Component Descriptions 6 Systems Overview 7 Supply Side 7 Process Side 8 Installation 9 Owner Installed Piping Tubing Electrical...

Страница 4: ...he essential elements for successful installation and operation of your system s You are encouraged to READ THIS MANUAL Pulsafeeder Pre Engineered Polymer Makedown Systems are designed to support mult...

Страница 5: ...the System disconnect pump s from power supply de pressurize the system and drain chemicals from the lines WARNING Inspect tubing regularly and replace as necessary When inspecting tubing wear protect...

Страница 6: ...ank This system can be used for two different chemicals or for redundant pump operation with one chemical Your skid system may be less complex than this Note the various components and their descripti...

Страница 7: ...ation Column Flow Indicator Water Static Mixer Made down Polymer Day Tank Back Pressure Valve Water Inlet Left Side Back or Front Mounting Base Made down Polymer Inlet Made down Polymer Outlet to Day...

Страница 8: ...is referred to as a flooded suction Because Neat Polymer is a high viscosity fluid the supply should never be located below the centerline of the pump s which is referred to as suction lift Connectio...

Страница 9: ...ere the injection point is below the Solution Supply Tank example injection into a well or where the injection point may be at reduced pressure example injection into the suction side of a pump instal...

Страница 10: ...with made down polymer Installation area should provide ease of access to skid components and pumps and the area should be kept free of clutter to enable safe operation and maintenance Note that pump...

Страница 11: ...nects the Pulsafeeder Polymer Makedown System to your served process Please refer to Figure 1 on page 6 If the injection point is below the dosing chemical source or if injecting into a low pressure a...

Страница 12: ...y providing a vent path to the calibration column bypassing the Back Pressure Valve 5 Turn POLY PUMP switch to Hand to start the Neat Polymer Pump 6 Observe polymer flow through the clear braided tubi...

Страница 13: ...ump neat polymer into the water flow where it is made down into a polymer solution and stored in the storage tank This process continues until the High Level switch is closed leading to the process fl...

Страница 14: ...setting the mixer will run continuously In Auto mode it will follow a timer sequence as selected by the operator from a multi position switch on the control panel For the VFD option the speed adjustm...

Страница 15: ...Automatic Polymer Makedown Systems Installation Operation and Maintenance Manual 72 910 APMDS E Rev D Skid Layout and Components Page 15 Electrical Schematic...

Страница 16: ...Automatic Polymer Makedown Systems Installation Operation and Maintenance Manual 72 910 APMDS E Rev D Skid Layout and Components Page 16...

Страница 17: ...Automatic Polymer Makedown Systems Installation Operation and Maintenance Manual 72 910 APMDS E Rev D Skid Layout and Components Page 17...

Отзывы: