SMD
pressure
seat
1SMD pressure seat
2Binder reed
3Discharging pressure rod
Installation
1 Select the appropriate operating space for placing mounter.
2 Place it in a dedicated support shelf
3 -Access to the power supply and gas supply
-Access to the power supply on the INPUT socket labeled
-Access to the vacuum pump power on the socket labeled
-Access to the gas pump source from the interface success of auxiliary
control cabinet
The Test and Operation security essentials
1Don’t hinder the moving parts when the machine is moving
2Don’t push the moving parts when the machine stop
3Make sure that the terminal connection is good
4After power off, please again after boot in 20 seconds
5Don’t insert the other equipment into the power socket
6An emergency,press the red stop switch,system power is disconnected
Operation panel
1Front panel
A: Emergency stop switch
Press the switch, the machine stop any ongoing action.
Press the switch clockwise, button pop-up, machine resets, the shaft back to
the origin position
B: Power switch
Control the electrical source on and off
2Main panel
A:Liquid crystal display
B:Keys
Содержание MT-60
Страница 23: ......