background image

 

J5

JP6

FLASH

24V ac

max 20 W

J5

24V

ac

230V

ac

F2

J5

JP3

JP8

JP9

JP1

JP2

JP3

T2

T1

TR2

C21

C24

5A

230Vac

DL2

-       + -       +

SENS

POWER

K4

C26

C27

K2

K3

-      +

-      +

OP2

OP1

V1

FR1

SET

SET  TX

WORK

BREAK

21        22

SW1

SW2

DL1

DL8

START STOP PED

U2

1     2    3     4

ON          ECE

24V

ac

230V

ac

F2

J5

JP3

JP8

JP9

1      2      3      4      5      6      7       8     9     10    11

12    13    14    15   16    17

18       19       20

JP1

JP2

JP3

T2

T1

TR2

C21

C24

POWER

230Vac

5A

230Vac

DL2

-       + -       +

SENS

POWER

K4

C26

C27

K2

K3

-      +

-      +

OP2

OP1

V1

FR1

SET

SET  TX

WORK

BREAK

21        22

SW1

SW2

DL1

DL8

START STOP PED

U2

1     2    3     4

ON          ECE

10                                                                                                                                                                                                                                                                                    Q81A_5_2021

Electrolock

12V max 15W

MEL04

Interface

MRX01

Interface

HOW TO PLUG THE 2nd RADIO CHANNEL INTERFACE  

slidewey

 ATTENTION: 

 

CUT THE POWER OFF BEFORE PLUGGING THE JACK

Plug th

MRX01

 jack (optional) onto connector 

J5

, respecting 

the slot orientation.

Before setting the dip-switch 

SW1

, make sure the power is off.

3.8 

FLASHING LIGHT

Wire the flashing light (max 20W) to 

10 – 11

, terminal 

JP6

.

•  QUICK blinking 

→ OPEN

•  SLOW blinking 

→ CLOSE

•  FIXED light on 

→ PAUSE

3.9 ELECTROLOCK

 ATTENTION: 

 

CUT THE POWER OFF BEFORE PLUGGING THE JACK

 

Plug the

 MEL04

 interface (optional) onto connector 

J5

, respecting the 

slot orientation.

Wire the ELECTROLOCK to  

MEL04

.

MEL04

Interface

slideway

MRX01 

Interface

contact 

N.O.

max 

1A - 24V

PROTECO S.r.l.

   

Via Neive, 77 - 12050 Castagnito (CN) ITALY     Tel. +39 0173 210111 - Fax +39 0173 210199      [email protected] - www.proteco.net

Содержание myGate PQ81A

Страница 1: ...r rolling code transmitters Input for 8K2 resistive safety edge Self diagnosis of malfunctions by LED coding 230Vac TECHNICAL FEATURES Item code PQ81A PQ81A1D Pcb s dimensions 137 x 84 x 37 mm Junction box dimensions 220 x 290 x 90 mm Pcb s weight 160 g Main Power supply 230V 50 60 Hz Power supply Tolerance 10 20 Transformer 230 21Vac 15VA Main Fuse 5 A Rated power 600 W Max power draw 3 5 A Power...

Страница 2: ...ight 4 DEFAULT SETTINGS pag 12 5 BROWSING THE MENU 5 1 FUNCTIONS MENU 5 1 1 Automatic closing 5 1 2 8K2 resistive safety edge input just in opening 6 OPERATION MODE pag 13 7 RADIO CODES pag 15 7 1 HOW TO DELETE EXISTING RADIO CODES 7 2 HOW TO STORE A RADIO CODE FOR START COMMAND 7 3 HOW TO STORE A RADIO CODE FOR PEDESTRIAN COMMAND 7 4 HOW TO STORE A RADIO CODE FOR THE 2 AUXILIARY RADIO CHANNEL 8 P...

Страница 3: ...be carried out by expert qualified personnel in full compliance with current regulation EN12453 Use of this control panel must be restricted to the transformer supplied by the Manufacturer A circuit breaker must be fitted close to the gate in compliance with the wiring diagram and installation instructions see paragraph 3 Stay clear of the gate s area of operation when in motion Frequently check t...

Страница 4: ...ing light relé TR2 filter JP1 GREEN TERMINAL aerial connection JP2 Secondary MOLEX card 24V ac JP3 Primary MOLEX card 230V ac JP4 BLUE TERMINAL command devices JP5 RED TERMINAL line and photocells JP6 YELLOW TERMINAL flashing light JP7 ORANGE TERMINAL motor 1 M1 JP8 BLACK TERMINAL motor 2 M2 JP9 GREEN TERMINAL line 230V earth SENS OBSTACLE DETECTION adjuster POWER THRUST adjuster SW1 SW2 FUNCTIONS...

Страница 5: ...PEDESTRIAN STOP START NEUTRAL CLOSING PHOTOCELL OPENING PHOTOCELL PHOTOCELL CLOSING PHOTOCELL OPENING 24V RX 24V TX RX TRANSFORMER 230V 21V RED RED BLACK BLACK 24V TX 3 ELECTRICAL CONNECTIONS CIRCUIT BREAKER CLOSE OPEN NEUTRAL NEUTRAL COMMON MOTOR 1 TO OPEN WIRING DIAGRAM FOR 230Vac operators N B ALL SAFETY DEVICES MUST BE CONNECTED BEFORE STARTING PROGRAMMING OTHERWISE THE CONTROL PANEL SHALL THE...

Страница 6: ...ocell in opening N C contact 7 RX photocells 24V 8 TX RX 24V 9 TX photocells 24V JP6 YELLOW TERMINAL flashing light 10 flashing light 24V ac max 20W 11 flashing light 24V ac max 20W JP7 ORANGE TERMINAL MOTOR 1 M1 12 OPEN 13 NEUTRAL MOTOR M1 14 CLOSE JP8 ORANGE TERMINAL MOTOR 2 M2 15 OPEN 16 NEUTRAL MOTOR M2 17 CLOSE JP9 GREEN TERMINAL line 230V earth 18 LINE 19 EARTH 20 NEUTRAL Make sure a circuit...

Страница 7: ...OR Left leaf M1 Right leaf M1 Brown Grey Blue Brown Black Grey Blue Black CAPACITOR Grey Blue Brown Black CAPACITOR Grey Blue Brown Black CAPACITOR Right leaf 1st opening M1 Brown Grey Blue Brown Black Grey Blue Black CAPACITOR Brown Grey Blue Brown Black Grey Blue Black CAPACITOR Grey Blue Brown Black CAPACITOR Grey Blue Brown Black CAPACITOR AUTOMATION MODEL 3 1 MOTORS WIRING M1 motor 1 first to...

Страница 8: ...ct can be wired in PARALLEL N O contact 3 3 1 TIMER It is possible to wire a TIMER N O contact to 1 4 terminal JP4 WARNING when connecting a TIMER the multi users function must be enabled SW1 DIP 2 ON TIMER 3 3 2 KEY SWITCH Wire the KEY SWITCH N O contact to 1 4 terminal JP4 3 2 MAIN POWER The main line must be protected by a proper CIRCUIT BREAKER Connect the line 230V to 18 19 20 terminal JP9 fu...

Страница 9: ...photocells through 7 8 9 terminal JP5 Wire the photocell contact N C contact to 6 7 terminal JP5 An additional photocell set can be wired in SERIES N C contact If the photocell beam is broken during OPENING the gate stops temporarily When the photocell beam is free the gate goes to normal operation The PHOTOCELLS IN OPENING are important for the safety of people and objects Nota Before wiring any ...

Страница 10: ...e gate stops and reverses If the contact is broken during OPENING the gate keeps on working normally 3 7 2 Mechanical safety edge in OPENING Wire the safety edge to 6 9 terminal JP5 If the contact is broken during OPENING the gate stops and reverses after 3 sec If the beam is broken during CLOSING the gate stops and reverses Mechanical safety edge photocells in OPENING Wire the safety edge and the...

Страница 11: ...n during CLOSING the gate stops and reverses 8K2 safety edge photocells in OPENING Adjust SW2 dip switch no 2 ON Press SET SET TX together and feed the control panel Wire the safety edge and the N C contact of the photocell in series If the contact is broken during OPENING the gate stops and reverses after 3 sec If the beam is broken during CLOSING the gate stops and reverses PROTECO S r l Via Nei...

Страница 12: ...ace HOW TO PLUG THE 2nd RADIO CHANNEL INTERFACE slidewey ATTENTION CUT THE POWER OFF BEFORE PLUGGING THE JACK Plug the MRX01 jack optional onto connector J5 respecting the slot orientation Before setting the dip switch SW1 make sure the power is off 3 8 FLASHING LIGHT Wire the flashing light max 20W to 10 11 terminal JP6 QUICK blinking OPEN SLOW blinking CLOSE FIXED light on PAUSE 3 9 ELECTROLOCK ...

Страница 13: ...TES when giving a start command by the remote control and stays for 90 seconds If you wish to choose this function mode select the switches as follows 1 ON 2 ON 3 OFF 4 NO EFFECT 3 10 2 Signalling LIGHT The contact ACTIVATES at OPENING and DESACTIVATES only at FINAL CLOSING POSITION If you wish to choose this function mode select the switches as follows 1 OFF 2 OFF 3 ON 4 NO EFFECT 3 10 3 Courtesy...

Страница 14: ...desired time the blinker turns off The time has been set automatic closing time max 120 sec To desactivate the AUTOMATIC CLOSING Press SET for 3 sec and release the led DL1 blinks Press BREAK and hold for 5 sec the AUTOMATIC CLOSING has been desactivated 5 1 2 8K2 RESISTIVE SAFETY EDGE INPUT just in opening To activate the 8K2 input as safety in opening press SET SET TX while turning the control p...

Страница 15: ...t accept additional START commands during OPENING and AUTOMATIC CLOSING COUNT DOWN dip n 3 dip n 4 OFF Double leaf gate mode ON Single leaf gate mode OFF Multi occupation mode DEACTIVATED ON Multi occupation mode ACTIVATED OFF Soft start mode DEACTIVATED At opening motors work at the set thrust POWER ON Soft start mode ACTIVATED At opening motors perform at maximum thrust for 1 5 sec to continue a...

Страница 16: ...CTIVATED N B It s mandatory to carry out the INPUT TEST OFF ON OFF Immediate closing mode DEACTIVATED ON Immediate closing mode ACTIVATED The gate starts CLOSING after 1 5 sec bypassing the AUTOMATIC CLOSING COUNT DOWN OFF ON OFF Ram stroke RELEASE mode DEACTIVATED ON Ram stroke RELEASE mode ACTIVATED At the endpoint stage during CLOSING and OPENING the motors press onto the mechanical endstop cut...

Страница 17: ... seconds DL1 blinks DL1 turns off All codes have been deleted 7 2 LOADING A REMOTE CONTROL AS START COMMAND Press SET TX once DL1 blinks 1 blink stop 1 blink Load within 5 sec the remote control you wish to store The control panel has stored the radio code and goes out the programming automatically You can store a maximum of 32 different radio codes Start Pedestrian 2 radio channel 7 3 LOADING A R...

Страница 18: ...he gate performs an OPENING RUN until fully open and a CLOSING RUN until fully close When the procedure is finished all time settings are saved The control panel is now ready for normal operation ATTENTION Check the proper GATE OPERATION SENSITIVITY If adjustments are needed turn SENS clockwise to and regulate accordingly The sensitivity has to be proper in order to prevent uncorrect operation OBS...

Страница 19: ...ly a short OPENING for 4 sec M1 first and M2 after delayed leaf then CLOSE until the ground mechanical endstop in closing At this stage the gate performs an OPENING RUN until fully open and a CLOSING RUN until fully close When the procedure is finished all time settings are saved The control panel is now ready for normal operation ATTENTION Check the proper GATE OPERATION SENSITIVITY If adjustment...

Страница 20: ... remote control Now M2 settings are LOADED Press the remote control M2 motor STARTS CLOSING Press the remote control the control panel starts counting the DELAY TIME in closing max 20 sec Press the remote control again to set the desired delay time standard operation 2 3 sec Now M1 motor starts automatically closing Let gates complete the closing run When the procedure is finished all time setting...

Страница 21: ...EDESTRIAN command SOLUTION Check the wiring and operation of the photocell Check the wiring and operation of the motors Check the connection to the power supply Check the operation of the ACCESSORIES wired to the START N O contact Check the wiring otherwise see section 3 5 Check the wiring diagram see section 3 5 Check the photocell alignment Check and remove the obstacle Check the wiring diagram ...

Отзывы: