4.5 Relay Outputs 

PPS  panel has two relays which are fault and alarm on main power module. 

Fault: 

This relay will be activated when any of the zone modules  in the system raise fault status. 

Alarm: 

This relay will be activated when any of the zone modules in the system will exceed the 

programmed alarm  level. 
 
Each zone module has three relays which are Alarm, Fan1 and Fan2. Their activation mechanism as 
follows: 

Alarm: 

This relay will be activated when the defined gaz level threshold exceed depending of the 

activity type defined for related zone. 

Fan 1: 

This relay will be activated after 30 seconds when any of the detectors will exceed the 

programmed F1 level in related zone. This relay will be deactivated after 240 seconds when the 
status returned to normal. 

Fan 2: 

 This relay will be activated after 30 seconds when any of the detectors will exceed the 

programmed F2 level in related zone. This relay will be deactivated afte 240 seconds when the status 
returned to normal. 

 

The relays are configured as NO (Normally Open) by default at factory. The relay configurations 
cannot be adjusted to NC (Normally Closed) 

Important: 

Relays should not be connected to high current or 220V AC loads. The relay outputs 

should be used as control signal and external relays should be used to drive such devices as relay on 
main board cannot handle high load.

 

5. FIRST RUN 

After power applied to PPS  panel  it will start illuminating the On LED. The LCD display shpw 
“Sacnning Detector” at same time while panel tries to initialize the detectors connected to it: 

 

 
 
 
 
Scanning will take at least 2 minutes. After two minutes each zone module installed on teh PPS panel 
will report the number of detectors they recognized: 
 
 
 
 
 
If all detectors working fine then LCD display will show the status of detectors: at first line the 
number of detectors and average gas measurement level, at the bottom the detector address which 
is measuring the highest gas level and the measurement level. 
 
 
 
 

Scanning 
Detector 

Detector 

01 

CO:000P 
D21:000P 

Содержание PPS Manager

Страница 1: ...EN Rev 03 10 04 2020 PROSENSE PPS Manager Gas Control Panel User Manual Prosense Teknoloji San Ltd ti Cumhuriyet Mah Mermer sok No 16 Kartal stanbul Tel 90 216 306 77 88 Faks 90 216 473 81 29 www pro...

Страница 2: ...who rely on this product for their safety could suffer severe personel injury or death Properly installed panel can be used without any problem and covered under Prosense warranty The warranties made...

Страница 3: ...onnection 11 4 4 Detector Connections 11 4 5 PPS Series Detectors Connections 13 4 5 Relay Outputs 15 5 FIRST RUN 15 5 1 Automatic Test 16 5 2 LED Test 16 6 PROGRAMMING 16 6 1 Set FAN1 Relay Level 16...

Страница 4: ...el exceeded and deacticvated after 240 seconds than the alarm status returned to normal The PPS Panel has one power module that can provide power to all zone modules This power module has also two rel...

Страница 5: ...uld not be placed near by high voltage cables or power cable coaxial cables or transmitters welding stations or frequency regulators The PPS Control Panel box produced based on IP66 standard specifica...

Страница 6: ...ecommends having cable entries from the lower side Electronic board is located in the front cover of the panel The power supply is located at the back of panel box The power must be connected to this...

Страница 7: ...configuration and display the detector details Their functions are given in table The key assignments may vary depending on the menu page Key Function For Configuration Function For Display Operation...

Страница 8: ...th key Diagram 7 Locker 3 1 LCD Screen PPS Panel has 2x8 LCD display on each zone module to show detector address measurement level and range as well as detector gas type Sign sample Meaning CO Measur...

Страница 9: ...Power module equipped with two relay modules as fault and alarm Fault relay will be activated when any of the detector goes in to fault status and alarm relay will be activated when any of the zone mo...

Страница 10: ...onnected to the system Take extra care to use correct poles while connecting the batteries The cables or main board can be damaged in case of mixing pins or making short circuits Backup batteries must...

Страница 11: ...ld be done with 1 5mm2 cross section cable The total distance between control panel and detectors should not exceed 800m Detector connections should be made with 4 core cable wire that 2 for power and...

Страница 12: ...mmunicate up to 32 detectors In case less then 32 detectors connected control panel would not show non existent detectors Unused detectors should be deactivated on channel settings menu steps The last...

Страница 13: ...RS485 board should be done by using connection cable EIA RS485 2 core wires with section 0 22 0 35 mm2 and shielded Nominal capacity between the wires 50pF m and nominal impedance 120 Ohms Detectors w...

Страница 14: ...am 15 RS485 Modbus serial communication module end of line jumper Important Only the last detector on the serial bus should have end of line pin 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3...

Страница 15: ...elated zone This relay will be deactivated afte 240 seconds when the status returned to normal The relays are configured as NO Normally Open by default at factory The relay configurations cannot be ad...

Страница 16: ...and turn off all of them except on LED as it is always blinking 6 PROGRAMMING The panel is already programmed and ready for using when shipped User should adjust the gas type alarm settings for each...

Страница 17: ...in menu or press again to exit from menu FAN1 level cannot be adjusted higher than the FAN2 relay level or Alarm relay alarm level Thus user should adjust first the FAN2 level or Alarm level 6 2 Set F...

Страница 18: ...ported by PPS Manager which are CO NO2 LPG Once decided press Menu button to continue It will show the current level Alarm level can be increased or decreased via pressing up and down arrow buttons Fo...

Страница 19: ...e connected detectors it asks user to confirm gas type The reason is to make sure whether user connected the detector by mistake or real usage as different gas types have different behaviours To set g...

Страница 20: ...f gas Once gas type set use T button to return back to main menu or press again to exit from menu 6 6 Set Language PPS Manager currently supports two languages which are English and Turkish User can c...

Страница 21: ...ration It will take at least two minutes to complete scan operation The screen will show number of detectors when scan opration completed Press T button to return back to main menu Menu will return to...

Страница 22: ...fault relay will be activated any one of the zone module raises a fault condition Same as fault alarm relay will be activated any one of the zone module raises an alarm condition The LEDs and related...

Страница 23: ...and fault LED activated Here the code details that can help to understand problem and find a resolution Fault Code Details 10 EFuse Dedektor Power Line Fault 11 No detector installed on zone module 1...

Страница 24: ...24 PRS UM PPSM EN Rev 03 10 04 2020 Declaration...

Страница 25: ...y fault is not found with he the equipment Prosense Technology shall not be liable for any loss or damage whatsoever or howsoever occasioned which may be a direct or indirect result of the use or oper...

Отзывы: