GETTING STARTED
1.
SHUTOFF MAIN AND INLET WATER SUPPLY AND DEPRESSURIZE BEFORE STARTING INSTALLATION
2.
Basic tools and materials required (not included). Plumbing may vary. Other materials may be
required.
a.
Pipe
cutter
b.
Compression fittings for INLET and outlet/To household plumbing – ¾” NPT fittings x size
of
piping
c.
3 ball valves and piping for bypass line set up
d.
PTFE Tape or paste (NSF approved for PVC)
e.
Adjustable
wrench
f.
Ground kit if required
3.
See Assembly Diagram below
4.
For City Water installation, install
SYSTEM
after the meter
5.
For Well Water installation, install
SYSTEM
after the pressure tank
6.
Remove components from carton and inspect
7.
3 stage filter tanks
MUST
be installed in sequence 1-2-3 with ElectroCharged™ Sub-micron following
tank 3
8.
Tanks are pre-filled at the factory. ElectroCharged™ Sub-micron filter assembly comes with
replaceable filter cartridge
9. DO
NOT
use pipe solvent (dope) as some types may cause damage to plastic fittings
10. DO
NOT
overtighten as it may cause damage to components and or property
11.
Determine location for
SYSTEM
and make sure
SYSTEM
is connected with the correct flow direction
12.
Install Bypass set up as shown in Assembly Diagram above
13.
BEFORE FINAL CONNECTION/INSTALLATION to household plumbing, follow surge flushing (16) on next
page
14.
Check to see if jumper ground kit is required before using
15.
Remove ElectroCharged™ Sub-micron filter cartridge from housing before Surge flushing process in
step (16)
USE TUBE SUPPORTS
WITH PEX TUBING
INCLUDED
Optional
Pre-sediment
filter assembly
ElectroCharged
TM
Sub-micron filter assembly
INSTALLS LIKE
ElectroCharged
TM
Sub-micron filter
assembly