
Pronar ZKP800
SECTION 4
4.4
ATTENTION!
Pipe profiles of the PTO shaft must overlap at least at 1/2 of the length in normal working
conditions and at least at 1/3 of the length in all working conditions.
When adjusting the PTO shaft, follow the instructions presented in the Operator's
Manual of the PTO shaft.
When the tractor with the manure spreader are turning or travelling on an uneven terrain,
the PTO shaft may be damaged and/or destroyed if it is squeezed or disconnected as a
result of its wrong adjustment.
TIP
Adjustment of the PTO shaft applies only to a specific type of tractor. If the machine is
connected to a different type of tractor, the adjustment procedure for this type of tractor
should be possibly carried out.
4.1.3 TEST START
If all the above activities have been performed and there is no doubt as to the good technical
condition of the rotary rake, the machine should be hitched to tractor according to instructions
specified in section 4.3 „HITCHING TO TRACTOR”. Start tractor engine, check all systems
and perform a test run of the rotary rake without load before beginning work. It is
recommended that the inspection is conducted by two people, one of which should always
remain in the tractor cab. Test start should be conducted according to the sequence shown
below.
Hitch rotary rake to tractor.
Connect PTO shaft and secure it in a proper manner.
Connect hydraulic system and electrical system lines.
Set raking arms, raise raking assemblies upwards maximally using the crank,
so that springtines do not touch surface.
Check correct operation of lights and indicators.
Start tractor.
Check operation of the raking assembly lifting/lowering system.
Содержание ZKP800
Страница 2: ......
Страница 3: ...ROTARY RAKE PRONAR ZKP800 MACHINE IDENTIFICATION TYPE ZKP800 SERIAL NUMBER ...
Страница 7: ......
Страница 8: ......
Страница 12: ......
Страница 13: ...SECTION 1 BASIC INFORMATION ...
Страница 24: ...Pronar ZKP800 SECTION 1 1 12 ...
Страница 25: ...SECTION 2 SAFETY ADVICE ...
Страница 38: ...Pronar ZKP800 SECTION 2 2 14 FIG 2 2 Locations of information and warning decals ...
Страница 39: ...SECTION 3 DESIGN AND OPERATION ...
Страница 49: ...SECTION 4 CORRECT USE ...
Страница 69: ...SECTION 5 MAINTENANCE ...
Страница 85: ...SECTION 5 Pronar ZKP800 5 17 FIG 5 5 Rotary rake lubrication points ...
Страница 86: ...Pronar ZKP800 SECTION 5 5 18 FIG 5 6 Rotary rake lubrication points ...
Страница 93: ...NOTES ...
Страница 94: ... ...
Страница 95: ...ANNEX A FIRST ASSEMBLY MANUAL ...