
1.
When changing the diaphragm, unscrew the diaphragm rupture
sensor from the dosing head.
2.
Check for electrical continuity:
3.
Using a blunt insulating probe (Ø 2 ... 3 mm, no sharp edges), press
into the channel of the diaphragm rupture sensor.
ð
Check that there is no electrical continuity
4.
Release the pin again.
ð
Electrical continuity must be re-established.
5.
Repeat the test several times.
6.
If everything is working correctly, screw the diaphragm rupture
sensor into the dosing head with a new seal (1).
7.
If not, go to the next section.
Replace separating diaphragm of the diaphragm rupture sensor
1.
Disconnect the diaphragm rupture sensor from the power supply.
2.
When changing the diaphragm, unscrew the diaphragm rupture
sensor from the dosing head.
3.
Grasp the upper section (2) of the diaphragm rupture sensor.
4.
Hold the body (5) in place with an open-ended spanner.
5.
Unscrew the top of the diaphragm rupture sensor.
6.
Clean the soiled parts.
7.
Lay the new separating diaphragm (3) with the light side (PTFE)
down into the upper section (2).
8.
Lay the plate (4) with the uneven side down into the upper section
(2).
9.
Screw the body (5) into the upper section and screw tighten.
10.
Check the diaphragm rupture sensor as described in “Check dia‐
phragm rupture sensor".
11.
If the diaphragm rupture sensor does not operate clearly and reli‐
ably, then a new diaphragm rupture sensor must be used without
fail.
Checking the diaphragm rupture sensor
1
2
3
4
5
Fig. 20
ATEX version
Repairs
52
Содержание Hydro 3 Series
Страница 17: ... refer to Technical Data chapter Ambient conditions Storage transport and unpacking 17 ...
Страница 95: ...95 ...