![probst VZ-H-UNI-KV Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/probst/vz-h-uni-kv/vz-h-uni-kv_operating-instructions-manual_1608390051.webp)
Operation
51600031-002
19 / 25
GB
Version B
To lay kerb stones with a gap of approx. 20 mm:
•
Mount the support roller (1) as shown in
Pic. 002.
Mount the steel grippers at the holder (in lower
position) and use therefor the upper holes
→
see
in Pic. B).
•
Position the device (
VZ-H-UNI
) with a gripped kerb stone
close on the already laid kerb stone (2) and place on the
support roller (1).
•
To laying the kerb stone, open the device (
VZ-H-UNI
)
only a little, so that the lamella/steel-gripper between
the kerb stones cannot move the kerb stones.
•
Lift the device (
VZ-H-UNI
) and thus the lamella causes a
distance between the kerb stones.
Pic. 002
Pic. B
(1)
(2)