![probst VZ-H-UNI-KV Скачать руководство пользователя страница 50](http://html1.mh-extra.com/html/probst/vz-h-uni-kv/vz-h-uni-kv_operating-instructions-manual_1608390050.webp)
Operation
51600031-002
18 / 25
GB
5.2.1
Installation versions
Version A
To lay kerb stones without gap:
•
Mount the support roller (1) as shown in
Pic. 001
.
Mount the steel grippers at the holder (in upper
position) and use therefor the lower holes
→
see
in
Pic. A).
•
Position the device (
VZ-H-UNI
) with a gripped kerb stone
close on the already laid kerb stone (2) and place on the
support roller (1).
•
When opening the device (
VZ-H-UNI
) the kerb stone
slide downwards und lays without gap to the already
laid kerb stone.
Pic. 001
Pic. A
(1)
(2)