![probst VZ-H-UNI-KV Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/probst/vz-h-uni-kv/vz-h-uni-kv_operating-instructions-manual_1608390046.webp)
Installation
51600031-002
14 / 25
GB
4.2
Hydraulical connection
•
The two hydraulic hoses (for opening and closing the device) on the carrier must be screwed onto the
two hydraulic connections on the valve block of the device (
VZ-H-UNI
).
•
A second control circuit is necessary if a rotating motor is integrated at the
VZ-H-UNI
.
•
In accordance with the enclosed hydraulic wiring diagram a unblockable
non-return valve
is built into the
(
VZ-H-UNI)
circuit to prevent, that the kerb stone does not fall down
,
loss of pressure.
•
Is there only one (two) hydraulic circuit on the lifting apparatus, you can split one of the circuits by using
a electromagnetic valve ELMV.
•
The hydraulic hoses must be free of breaks and abrasion. Take care that there are no outstanding edges,
where the hoses could hook in.
G
A faultless and reliable in operation function of the device (
VZ-H-UNI
) is ensured, if the following values are
adjusted.
Installed load:
optimal
minimal
maximal
Conveying line
Support frame:
25 in l/min
15 in l/min
75 in l/min
Line pressure
Support frame:
200 bar
200 bar
250 bar
Back pressure
in return flow:
0 bar
0 bar
5 bar
To avoid disorders and failed functions it is absolute necessary, for every commissioning of the device
(
VZ-H-UNI
), to check the correct connection of the hydraulic hoses!