Operation
36 / 42
V2
GB
●
In freely hanging condition of the HVZ the control lever repeated on "open" operate and there so for a long
time hold, until the main clamping is completely opened and was driven out the pushing-off cylinders.
HINT:
This manipulation can also take place, for saving time during the HVZ
is moving
back (in
startposition) for a new gripping action of the next stone layer.
Now the lying cycle is finished, the device is ready for the admission of the next stone layer which can be
installed.
The laying cycle is finally finished, when the springs of the ADV (see
in fig.1 ) are complete visible.
Содержание HVZ-UNI-II-EK
Страница 33: ...Adjustments 31 42 V2 GB Danger of injuring the hands A A C...
Страница 70: ......
Страница 71: ...OPERATION AND MAINTENANCE 22500038 FR 55 22500039 FR 15 FD 30 GB...