a. Thread the Upper Cable (
44
) through the Upper Frame (
6
), and fix 1 x Pulley (
39
) to the Upper Frame
(
6
) using 1 x M10 x 45mm Allen Bolt (
77
), 2 x Ø10mm Washers (
49
) and 1 x M10 Aircraft Nut (
51
).
Put the cable through the slot of the Front Press Base (
9
).
b. Thread the Upper Cable (
44
) through the Vertical Frame (
5
), and fix 1 x Pulley (
39
) to the Vertical
Frame (
5
) using 1 x M10 x 45mm Allen Bolt (
77
), 2 x Ø10mm Washers (
49
) and 1 x M10 Aircraft Nut
(
51
).
c. Thread the Upper Cable (
44
) through the Front Press Base (
9
), and fix 1 x Pulley (
39
) to the Front
Press Base (
9
) using 1 x M10 x 140mm Allen Bolt (
79
), 2 x Ø10mm Washers (
49
) and 1 x M10
Aircraft Nut (
51
), then thread the cable back.
d. Thread the Upper Cable (
44
) through the Vertical Frame (
5
), and fix 1 x Pulley (
39
) to the Vertical
Frame (
5
) using 1 x M10 x 45mm Allen Bolt (
77
), 2 x Ø10mm Washers (
49
) and 1 x M10 Aircraft Nut
(
51
).
e. Cover 1 x Pulley (
39
) with 2 x Pulley Covers (
40
), push 2 x Double Floating Pulley Brackets (
25
) on
both sides of the pulley assembly and secure with 1 x M10 x 45mm Allen Bolt (
77
), 2 x Ø10mm
Washers (
49
) and 1 x M10 Aircraft Nut (
51
).
f. Thread the Upper Cable (
44
) through the slot on the Upper Frame (
6
), and fix 1 x Pulley (
39
) to the
Upper Frame (
6
) using 2 x Ø25 x 15 Pulley Bushings (
78
), 1 x M10 x 70mm Allen Bolt (
81
) and 1 x
M10 Aircraft Nut (
51
).
g. Connect the Upper Cable (
44
) with the Selector Rod (
19
). It should be no less than 10mm to screw
the bolt in the Selector rod (
19
).
Step 19
Assembly instructions
25