E
[email protected] www.harvesthealthcare.co.uk
9
5. Once the top pad is connected the lower pad should fall in place and can be zipped up, once
again ensure the padding passes over the top of the side rail.
6. Carry out the same procedure for the opposite side.
7. There are 4 zips in the base sheet to allow the mattress guides to pass through.
Open the tips, pass the mattress guides through the base sheet then close both zips around the
mattress guides.
8. Once installed correctly the inside of the bed should look like the below image.
9. Tubing can be passed through the gaps created for the mattress guides.
10. There are zips on each padded section to allow the foam protection to be removed before
washing.
2 BAR BUMPER
INSTALLATION