E
[email protected] www.harvesthealthcare.co.uk
11
5. Bring the rest of the bumper pads from the inside of the bed over the top rail to the outside of
the bed and pass them between the top and middle rails.
6. Zip the pad around the centre rail.
7. Finally zip the pad around the bottom rail.
8. Feed the mattress guides through the base sheet and close the zips.
3 BAR BUMPER
INSTALLATION
9. There are 2 holes in the base sheet to allow tubing to pass between the inside and outside of the
of the platform.