Prinzen PSPC5 Скачать руководство пользователя страница 1

 

SERVICE MANUAL PSPC5 

 
 
 
 

 

Prinzen B.V. 

 

Weverij 18 

 

7122 MS  AALTEN 

 

P.O. Box 85 

 

7120 AB  AALTEN 

 

NEDERLAND 

 
 

Phone: 

+31(0) 543 490060 

 

Fax: 

+31(0) 543 476205 

 

e mail: 

[email protected]

 

 

Website: 

www.prinzen.com

 

 
 

Содержание PSPC5

Страница 1: ...SERVICE MANUAL PSPC5 Prinzen B V Weverij 18 7122 MS AALTEN P O Box 85 7120 AB AALTEN NEDERLAND Phone 31 0 543 490060 Fax 31 0 543 476205 e mail service prinzen com Website www prinzen com...

Страница 2: ......

Страница 3: ...3 of 73 TABLE OF CONTENTS CHAPTER BOOK INTRODUCTION I 1 SAFETY I 2 INSTALLATION I 3 COMPONENTS ADJUSTMENTS I 4 DESCRIPTION PACKER I 5 DESCRIPTION OUTPUT CONVEYOR I 6 DESCRIPTION 30 CELL TRAY DENESTER...

Страница 4: ......

Страница 5: ...SAFETY REGULATIONS 22 TRANSPORT 22 STORAGE 22 ASSEMBLY AND INSTALLATION 22 PREPARATION 23 FACILITIES 23 INSTALLATION DATA 23 INSTALLATION 24 SAFETY REGULATIONS 24 PACKER 24 OUTPUT CONVEYOR 25 ELECTRIC...

Страница 6: ...VACUUM HEAD TRAY SET POSITION 48 SPEED LEFT RIGHT 49 VACUUM HEAD ZERO POSITION 49 VACUUM VALVE PARTS REPLACEMENT 50 5 OUTPUT CONVEYOR 53 DESCRIPTION OUTPUT CONVEYOR 54 ADJUSTMENTS OUTPUT CONVEYOR 56...

Страница 7: ...INTRODUCTION SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 7 of 73 INTRODUCTION...

Страница 8: ...he machine ATTENCION Cualquier persona que ajusta esta m quina debe leer este manual de manejo antes de ajustar ATTENTION Chacun qui r gle cette machine doit lire le manuel en avant VORSICHT Jeder der...

Страница 9: ...ns important information concerning safety and adjustment of the Prinzen BV system For uncomplicated functioning of the system read this manual carefully and adjust according to the directions in this...

Страница 10: ...f a work permit is required for this job All safety devices installed in the machine by the manufacturer and the indications mentioned in the manuals are conditions to control the machine safely Techn...

Страница 11: ...alers The service engineer must read the total manual SYMBOLS Symbols are used in the manual when special attention caution is required while working on the system The special symbols and their meanin...

Страница 12: ...name of the system followed by the layout of the system Rated voltage This is the required power supply for this system wires frequency power Wires 3 N 3 phase N PE Wires 3 3 phase PE Wires 1 N 1 pha...

Страница 13: ...2007 SERVICE MANAUL PSPC5 Page 13 of 73 ADDRESS PRINZEN Prinzen BV Weverij 18 7122 MS AALTEN P O Box 85 7120 AB AALTEN The Netherlands Telephone 31 0 543 490060 Fax 31 0 543 476205 E mail info prinze...

Страница 14: ......

Страница 15: ...SAFETY SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 15 of 73 1 SAFETY...

Страница 16: ...s into specific packaging Any other use of the system is not permitted SAFETY INSPECTION PROCEDURE Before starting any adjustments and after finishing an adjustment job make sure that all protective c...

Страница 17: ...d be present Before starting to adjust the machine follow the steps mentioned below Switch off the machine and secure it against accidental switching on Post Do not switch on warning sign on the main...

Страница 18: ...ne safely Never operate the machine when protective covers are removed because serious injury or death may occur DEFINITION OF SAFETY DEVICES Safety devices are lockable doors 2 emergency buttons 3 an...

Страница 19: ...et Contacting parts inside this cabinet may result in permanent personal injury or death This sign is used to warn for dangerous movements Keep a safe distance to those parts Disregarding this warning...

Страница 20: ......

Страница 21: ...INSTALLATION SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 21 of 73 2 INSTALLATION...

Страница 22: ...have a high leveled center of gravity and have the danger of tipping over STORAGE On arrival the machine must be checked immediately for damages Damages must be reported to the Transport Company and t...

Страница 23: ...ust be in a clean condition The supplied air must be clean and according the requirements The floor must be flat and smooth with sufficient bearing power The climate around the machine must have a nor...

Страница 24: ...PACKER Follow the below adjustment procedure for installation of the packer 1 Place the packer with the infeed belt in front of the egg collecting belt The distance between the strip of the infeed be...

Страница 25: ...it must still be possible to move the output conveyor in both directions 7 The distance between the output conveyor and the packer must be approximately 30 cm normally the position of the output conve...

Страница 26: ...the electrical cabinet 12 Each plug connector is protected against wrong plug insertion There are 4 unique plug connector combinations VACUUM HEAD PROTECTION ATTENTION Never change the position of th...

Страница 27: ...d Q3 are ON starting the system may damage the clutch of the denester Follow below installation procedure carefully to prevent this 19 Press the start button once to reset the system and press it a se...

Страница 28: ...denester 25 Remove the warning label from the start button of motor protection switch F3 26 Press the black start button of F3 and immediately check if the output conveyor is running When this is the...

Страница 29: ...o pick it up press the stop button 36 The vacuum head stops at its pick up position The pick up position depth is factory adjusted See adjustment procedure of the vacuum head pick up position 37 The s...

Страница 30: ...In case of not centered suction cups change the position of the output conveyor until the suction cups of the vacuum head are on the correct position above the tray the bolts that fasten the output co...

Страница 31: ...heck the start and stop timers for the egg collecting conveyor When the infeed belt of the packer is full with eggs from the egg collecting conveyor the egg pressure switches at the side of the infeed...

Страница 32: ...ers When disassembling parts and materials take note of the applicable environmental regulations All activities must be carried out according to local and national regulations and company safety requi...

Страница 33: ...COMPONENTS ADJUSTMENTS SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 33 of 73 3 COMPONENTS ADJUSTMENTS...

Страница 34: ...ut should not be influenced by other objects or parts even while the system is running The yellow LED turns ON when an object is detected Adjust the photo switch as follows Without an object the LED 1...

Страница 35: ...block the valves for controlling the following parts are positioned 3 Vacuum head outside tray set position 4 Vacuum head inside tray set position 5 Hatch tray stopper cylinder 1 6 Hatch tray stopper...

Страница 36: ...arrows 4 to view a certain parameter Press the enter key 5 to display the parameter value Press the up or down button to change the parameter Confirm the change with the ENTER button Press the menu k...

Страница 37: ...PACKER SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 37 of 73 4 PACKER...

Страница 38: ...system Attached to the packer are 8 Electrical cabinet 9 Operating panel 10 Outfeed conveyor 11 30 cell tray denester 12 Hatch tray denester Construction Infeed conveyor An AC motor 20 situated under...

Страница 39: ...of the main drive Construction Roller track The roller track drive shaft drives 2 transport chains 50 on both sides of the packer transporting shafts with rollers 51 On the topside the transport chain...

Страница 40: ...e into guides 62 that separates them and guide them to the correct position for receiving eggs at the transfer position A transmitter receiver sensor 63 detects eggs in the cups at the transfer lever...

Страница 41: ...rent positions using 2 air controlled cylinders 80 Underneath the vacuum head the suction cups 81 are placed that carry the eggs The vacuum head is connected with the vacuum pump 82 via the vacuum hos...

Страница 42: ...on rollers and bearings GATE BLOCKERS Gate blockers prevent the possibility of 2 smaller eggs entering 1 gate When smaller eggs are produced keep all gate blockers in the infeed gates 4 When the produ...

Страница 43: ...her on in this chapter By hand move the roller track forward or backwards until one shaft with rollers is exactly at the position of the mark Place back the 2 bolts and tighten up the taper lock to th...

Страница 44: ...track Place back the 2 bolts and tighten up the taper lock to the shaft TIP Make sure the roller track is at the correct stop position before adjusting the cup conveyor stop position MAIN DRIVE STOP S...

Страница 45: ...ion take out the lock pin 32 from the rear of the tensioner push the green chain tensioner in and place the lock pin into the lock hole 33 LOOSEN UP TAPER LOCKS To loosen up the connection between a t...

Страница 46: ...of the system 54 Push the shaft with rollers towards the other side of the system 55 Bring the gap in the roller track towards the star shaped cam by pushing the start button on the operating panel wh...

Страница 47: ...63 are exactly in the center of the cups 64 Adjust the front rear position of the vacuum head by loosening up the 2 bolts 65 that connect the complete vacuum head holder on the beam Move the complete...

Страница 48: ...e cup TIP For the explanation how to change the pick up position see the user manual VACUUM HEAD TRAY SET POSITION Follow below steps to move the vacuum head to the tray set position 70 Set the clear...

Страница 49: ...er supply is off This results in a lost encoder position and may damage the system when started 80 Press the emergency button Keep the main power to the system ON 81 Loosen up the setscrew of the flex...

Страница 50: ...1x Washer 0 3 mm 3x O ring 38x3 1x O ring 30x3 Follow below procedure to replace the filter 1 Remove the 3 bolts that fasten the cover to the casing 2 Carefully place a screwdriver in between the cov...

Страница 51: ...om the replacement set Place the washers in the order of removal on a table and place them back in the exact same order Follow below procedure to replace the o rings and the springs on the cover 2 sid...

Страница 52: ......

Страница 53: ...OUTPUT CONVEYOR SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 53 of 73 5 OUTPUT CONVEYOR...

Страница 54: ...denester and a drive mechanism 3 for the hatch tray denester It is possible to attach the 30 cell tray denester and or the hatch tray denester The air supply 4 is also attached to the output conveyor...

Страница 55: ...e 30 cell trays a solenoid 23 controls a lever 24 When the solenoid is activated it puts the lever in the position where it stops the tray at the tray set position 25 When the solenoid is deactivated...

Страница 56: ...sult in a damaged belt or wear on rollers and bearings 30 CELL TRAY GUIDE Pull the 30 cell tray guides 4 up and slide them towards the end of the conveyor for guiding the 30 cell trays When hatch tray...

Страница 57: ...packer and wait until the egg is transported towards the end of the cup conveyor 15 As soon as the vacuum head picks up the egg and starts moving towards tray press the stop button 16 The vacuum head...

Страница 58: ......

Страница 59: ...30 CELL TRAY DENESTER SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 59 of 73 6 30 CELL TRAY DENESTER...

Страница 60: ...0 of the tray denester On both sides of the crankshaft cranks 11 are connected to tie rods 12 A solenoid 13 controls the start and stop of the crankshaft and thus the movement of the tie rods Construc...

Страница 61: ...en it is running production ATTENTION Do not enter objects or body parts into the denester when it is running production Safety The denester is not completely secured with protective covers Therefore...

Страница 62: ...g the stop button 25 Machine stopped by stop button is visible on the display Activate the INCH button 26 shortly to move the denester block to its top position When the pins of all grippers 27 are in...

Страница 63: ...able to rotate 43 Rotate the cam ring and place it back ATTENTION Do not remove the bottom ring This ring is factory set Removing this ring damages the clutch TIP A small movement of the cam ring resu...

Страница 64: ......

Страница 65: ...HATCH TRAY DENESTER SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 65 of 73 7 HATCH TRAY DENESTER...

Страница 66: ...eyor is directly mounted on a crankshaft 5 On both sides of the crankshaft cranks 6 are connected to tie rods 7 A sensor 8 determines the stop position of the crankshaft and thus the stop position of...

Страница 67: ...n it is running production ATTENTION Do not enter objects or body parts into the denester when it is running production Safety The denester is not completely secured with protective covers Therefore b...

Страница 68: ...space with the positions of the sides 2 of the bunker Adjust the 4 sides in such a way that the trays are centred on the output conveyor TOP GRIPPER The top gripper must be set in the lowest position...

Страница 69: ...he position of the detection bolt on the crankshaft Tighten up the detection bolt 13 Pull the emergency button and start the system by pressing the start button twice 14 As soon as the outfeed conveyo...

Страница 70: ......

Страница 71: ...TROUBLE SHOOTING GUIDE SM PSPC5 01 E 12 2007 SERVICE MANAUL PSPC5 Page 71 of 73 8 TROUBLE SHOOTING GUIDE...

Страница 72: ...defective Replace Egg collecting belts are not activated Panel egg collecting belt is ON 4 Relay K10 defective Replace Egg collecting belts doesn t stop 1 Pressure control micro switch is defective R...

Страница 73: ...lector switch on conveyor is OFF Switch ON Hatch tray denester doesn t start Machine is running 2 Motor circuit breaker is OFF Solve problem and switch K7 ON 1 Photocell tray present incorrect adjuste...

Отзывы: