
Chapter 6
Advanced Topics
83
83
drawback is that a data overrun may occur if the number of images collected exceeds the
amount of allocated RAM or if the computer cannot keep up with the data rate.
Note:
LightField always uses Fast Mode.
Safe Mode (WinX)
In Safe Mode operation, the computer processes each frame as it is received: the ProEM+
cannot collect the next frame until the previous frame has been completely processed.
Safe Mode operation is useful when the camera is operated from a slower computer that
cannot process the incoming data fast enough. It is also useful when data collection must
be coordinated with external devices such as external shutters and filter wheels. As seen
in Figure 46, in Safe Mode operation, the computer controls when each frame is taken.
After each frame is received, the camera sends the stop command to the camera,
instructing it to stop acquisition. Once that frame is completely processed and displayed,
another start command is sent from the computer to the camera, allowing it to take the
next frame. Display is therefore, at most, only one frame behind the actual data
collection. One disadvantage of the Safe mode is that events may be missed during the
experiment, since the camera is disabled for a short time after each frame.
Note:
When running WinX, Safe Mode must be used whenever the system is set up for
the optional Kinetics Readout Mode. See
“Kinetics
Mode”
(page 86) for more
information about this type of image acquisition and readout.
Содержание ProEM+ EMCCD
Страница 1: ...EMCCD Cameras For Imaging and Spectroscopy ProEM System Manual...
Страница 2: ...4411 0144 Version 1 B January 07 2012 4411 0144...
Страница 11: ...x ProEM System Manual Version 1 B This page intentionally left blank...
Страница 17: ...16 ProEM System Manual Version 1 B This page intentionally left blank...
Страница 77: ...76 ProEM System Manual Version 1 B This page intentionally left blank...
Страница 85: ...84 ProEM System Manual Version 1 B Figure 46 Flowcharts of Safe and Fast Mode Operation...
Страница 99: ...98 ProEM System Manual Version 1 B Figure 63 WinX Vertical Shift...
Страница 121: ...120 ProEM System Manual Version 1 B This page intentionally left blank...
Страница 125: ...124 ProEM System Manual Version 1 B This page intentionally left blank...
Страница 127: ...126 ProEM System Manual Version 1 B ProEM 512BK Kinetics Figure 84 ProEM 512BK Outline Drawing...
Страница 129: ...128 ProEM System Manual Version 1 B ProEM Power Supply Figure 86 ProEM Power Supply Outline Drawing...
Страница 130: ...Appendix B Outline Drawings 129 129 CoolCUBEII optional Figure 87 CoolCUBEII Outline Drawing...
Страница 131: ...130 ProEM System Manual Version 1 B This page intentionally left blank...