
70276001
25
Section 5 Service Procedures
To reduce the risk of electric shock, fire, explosion, serious injury or death:
• Disconnect electric power to the tumbler before servicing.
• Close gas shut-off valve to gas tumbler before servicing.
• Close steam valve to steam tumbler before servicing.
• Never start the tumbler with any guards/panels removed.
• Whenever ground wires are removed during servicing, these ground wires must be
reconnected to ensure that the tumbler is properly grounded.
W002
WARNING
24. LOAD READY LIGHT
(Manual Timer Models)
Refer to Figure 3.
a. Remove four screws from top and bottom
surfaces of exterior control box cover.
b. Pull cover forward. Disconnect wires from light
terminals and remove light by depressing
locking tabs.
NOTE: Refer to wiring diagram when rewiring
light.
25. IGNITION RESET SWITCH
(European Gas Models Only)
Refer to Figure 3.
a. Remove four screws from top and bottom
surfaces of exterior control box cover.
b. Pull cover forward. Disconnect control box
cover harness and remove cover assembly.
c. Remove wires from ignition switch terminals
and remove switch by depressing locking tabs.
NOTE: Refer to wiring diagram when rewiring
reset switch.
26. EMERGENCY STOP SWITCH
(European Gas Models Only)
Refer to Figure 3.
a. Remove four screws from top and bottom
surfaces of exterior control box cover.
b. Pull cover forward. Disconnect control box
cover harness and remove cover assembly.
c. Remove wires from emergency stop switch
screw terminals.
d. Remove switch from control cover by
loosening long screw at bottom of switch
followed by grasping a pulling down black L-
shaped lever on top of switch.
NOTE: Refer to wiring diagram when rewiring
emergency stop switch.
27. PUSH-TO-START SWITCH
(Manual Timer Models)
a. Remove four screws from top and bottom
surfaces of exterior control box cover and
remove cover, disconnecting control box cover
harness or load ready light wires.
b. Remove screw from left and right sides of
control bracket securing control plate. Refer to
Figure 3.
c. Pivot plate forward to horizontal.
d. Disconnect wires from switch terminals and
remove switch by depressing locking tabs.
NOTE: Refer to wiring diagram when rewiring
switch.
28. COOL DOWN AND HEAT LIGHTS
(Manual Timer Models)
a. Remove four screws from top and bottom
surfaces of exterior control box cover and
remove cover, disconnecting control box cover
harness or load ready light wires.
b. Remove screw from left and right sides of
control bracket securing control plate. Refer to
Figure 3.
c. Pivot plate forward to horizontal.
d. Disconnect wires from light terminals and
remove switch by depressing locking tabs.
NOTE: Refer to wiring diagram when rewiring
light.
Содержание D55
Страница 1: ...D55 SERVICE MANUAL INDUSTRIAL DRYERS PUBLICATION DATE 10 03 70276001 ...
Страница 2: ......
Страница 10: ...8 70276001 Section 2 Introduction Notes ...
Страница 24: ...22 70276001 Section 4 Grounding Copyright Alliance Laundry Systems LLC DO NOT COPY or TRANSMIT Notes ...
Страница 54: ...52 70276001 Section 5 Service Procedures Copyright Alliance Laundry Systems LLC DO NOT COPY or TRANSMIT Notes ...
Страница 80: ...78 70276001 Section 7 Wiring Schematics Copyright Alliance Laundry Systems LLC DO NOT COPY or TRANSMIT Notes ...
Страница 81: ......
Страница 82: ......