background image

 

 

 

1

 

 

 

 

 

 

What’s

 

In

 

The

 

Box:

 

 

Upon

 

opening

 

your

 

Myriad

 

Reservoir

 

box

 

you

 

will

 

notice

 

3

 

inner

 

boxes

 

labeled

 

Box

 

1,

 

2,

 

and

 

3.

  

Start

 

with

 

Box

 

3.

 

This

 

box

 

contains

 

the

 

pump

 

housing

 

for

 

the

 

D5

 

pump

 

mount.

 

The

 

included

 

pieces

 

are

 

shown

 

below.

 

 

 

 

 

 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

Carefully

 

remove

 

all

 

the

 

items

 

from

 

the

 

box

 

and

 

set

 

them

 

on

 

the

 

flat

 

surface

 

in

 

front

 

of

 

you.

   

 

 

 

 

 

 

 

Myriad Reservoir System

 

Congratulations

 

on

 

purchasing

 

the

 

most

 

advance

 

and

 

versatile

 

reservoir

 

system

 

ever

 

built.

  

Please

 

follow

 

the

 

install

 

guide

 

steps

 

in

 

the

 

exact

 

order

 

listed.

 

Assembly

 

Time:

 

20

 

minutes

 

Needed

 

for

 

Install:

 

‐ 

Phillips

 

and

 

Flat

 

head

 

screw

 

driver.

  

Please

 

do

 

not

 

use

 

any

 

power

 

screw

 

drivers

 

or

 

drills.

 

Small

 

section

 

of

 

tube

 

for

 

testing.

 

Flat

 

Clean

 

surface

 

24

 

inch

 

by

 

24

 

inch

 

area

 

is

 

recommended.

 

Well

 

lit

 

area,

 

and

 

a

 

comfortable

 

seat.

 

    

   

 

Imp

orta

nt

 

Info

 

Содержание Myriad D5

Страница 1: ...flat surface in front of you Myriad Reservoir System Congratulations on purchasing the most advance and versatile reservoir system ever built Please follow the install guide steps in the exact order...

Страница 2: ...rrectly installed when the O ring sticks up out of the groove by about 1 32 inch Step 3 Box 3 Install and Secure Outlet Channel Cover Note Over tightening the screws in this next step will cause the a...

Страница 3: ...oved and stop Now lay the paper back down on the acrylic It will not stick again but will protect the acrylic from getting scratched while you move onto the next step Set this piece aside and proceed...

Страница 4: ...n one corner of the frame Begin feeding it and pressing it into the groove of the frame Take your time if you go too fast the O Ring WILL pop out As you do this you will need to stretch the O ring and...

Страница 5: ...the holes These screws are to be used in the center 4 holes ONLY Gently tighten the screws in the order shown in the picture to 80 then repeat to 100 100 should be the equivalent to hand tight tensio...

Страница 6: ...he level of tightness you should achieve IMPORTANT If you see that the acrylic is touching making contact with the frame then the screw is too tight Untighten the screw until it does not make contact...

Страница 7: ...hten screws into plate Tighten the screws all the way down and then untighten approximately turn or until the plate slides back and forth Repeat for other bracket There are 8 screws per bracket to be...

Страница 8: ...be the top right and bottom left when looking at the rear of the reservoir no matter the orientation As with any water cooling project testing new hardware before putting it into service is required T...

Страница 9: ...VD drive that is twice as tall Insert the reservoir so its flush with the case and tighten the screws on the bracket plates You may need to remove the reservoir and repeat this process a couple times...

Отзывы: