background image

 

 

 

9

 

Step

 

13

  

                                     

Final

 

Install

 

 

 

a.

 

Install

 

Brush

 

Aluminum

 

Face

 

Cover:

  

Peel

 

paper

 

off

 

the

 

double

 

sided

 

adhesive

 

tape

 

and

 

stick

 

to

 

the

 

acrylic

 

face

 

plate.

  

Make

 

sure

 

all

 

the

 

edges

 

are

 

flush

 

and

 

press

 

sticky

 

side

 

against

 

faceplate.

 

 

b.

 

Install

 

Reservoir

 

into

 

Case:

 

Pick

 

two

 

bays

 

and

 

slide

 

in.

 

(Installation

 

is

 

just

 

like

 

installing

  

a

 

DVD

 

drive

 

that

 

is

 

twice

 

as

 

tall.)

 

 

Insert

 

the

 

reservoir

 

so

 

its

 

flush

 

with

 

the

 

case

 

and

 

tighten

 

the

 

screws

 

on

 

the

 

bracket

 

plates.

 

You

 

may

 

need

 

to

 

remove

 

the

 

reservoir

 

and

 

repeat

 

this

 

process

 

a

 

couple

 

times

 

to

 

get

 

the

 

perfect

 

fit.

 

 

Once

 

you

 

are

 

satisfied

 

with

 

the

 

fit,

 

tighten

 

the

 

screws

 

completely

 

so

 

the

 

reservoir

 

does

 

not

 

slide.

 

 
 

You

 

are

 

now

 

ready

 

to

 

complete

 

the

 

rest

 

of

 

your

 

watercooing

  

rig

 

and

 

reap

 

the

 

rewards

 

of

 

your

 

new

 

reservoir.

 

 
 

Still

 

have

 

questions?

  

Contact

 

us

 

at

 

Primochill.com

 

or

 

call

 

us

 

toll

 

free

 

at

 

(800

690

9081).

 

 

Содержание Myriad D5

Страница 1: ...flat surface in front of you Myriad Reservoir System Congratulations on purchasing the most advance and versatile reservoir system ever built Please follow the install guide steps in the exact order...

Страница 2: ...rrectly installed when the O ring sticks up out of the groove by about 1 32 inch Step 3 Box 3 Install and Secure Outlet Channel Cover Note Over tightening the screws in this next step will cause the a...

Страница 3: ...oved and stop Now lay the paper back down on the acrylic It will not stick again but will protect the acrylic from getting scratched while you move onto the next step Set this piece aside and proceed...

Страница 4: ...n one corner of the frame Begin feeding it and pressing it into the groove of the frame Take your time if you go too fast the O Ring WILL pop out As you do this you will need to stretch the O ring and...

Страница 5: ...the holes These screws are to be used in the center 4 holes ONLY Gently tighten the screws in the order shown in the picture to 80 then repeat to 100 100 should be the equivalent to hand tight tensio...

Страница 6: ...he level of tightness you should achieve IMPORTANT If you see that the acrylic is touching making contact with the frame then the screw is too tight Untighten the screw until it does not make contact...

Страница 7: ...hten screws into plate Tighten the screws all the way down and then untighten approximately turn or until the plate slides back and forth Repeat for other bracket There are 8 screws per bracket to be...

Страница 8: ...be the top right and bottom left when looking at the rear of the reservoir no matter the orientation As with any water cooling project testing new hardware before putting it into service is required T...

Страница 9: ...VD drive that is twice as tall Insert the reservoir so its flush with the case and tighten the screws on the bracket plates You may need to remove the reservoir and repeat this process a couple times...

Отзывы: