5. Determine the mounting location by referencing the key-hole slot located on the back of the device.
6. Mark and pre-drill a mounting hole into the solid and level wall surface.
7. Insert wall anchor into the mounting hole.
8. Insert a screw into the wall anchor, leaving approximately 3/8” of the screw head exposed for hanging.
9. Attach the device to the wall surface by sliding the key-hole slot onto the mounting screw. Ensure the device is
properly secured and level.
10. Apply power to the bell controller; AC or PoE.
11. When power was applied, the device automatically initiated a check-in to OneVue. Verify its LCD displays Signal
OK, which indicates it successfully checked-in to OneVue.
If the LCD screen does not display Signal OK, it's recommended to initiate a manual check-in to validate the
device can connect to the facility network and OneVue at its install location. Press and release its check-in button
. The device emits a series of audio beeps indicating its connection sequence.
During an active check-in connection, additional pressing of the check-in button is ignored.
1 beep: device booted
2 beeps: device connected to network
3 beeps: device connected to OneVue
Page 13