![Primes MicroSpotMonitor Plus HighBrilliance Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/primes/microspotmonitor-plus-highbrilliance/microspotmonitor-plus-highbrilliance_original-instructions-manual_1601728039.webp)
39
Revision 00 EN - 02/2022
MSM+ HB
35,0(6
8.9
Cooling water
NOTICE
Fire hazard; Damage/Destruction of the device due to overheating
If there is no water cooling or a water flow rate which is insufficient, there is a danger of
overheating, which can damage the device or set it on fire.
X
Only operate the device with a connected water cooling and a sufficient water flow rate.
The connections at the MSM+ HB are intended for PE-hoses with a diameter of 12 mm (respectively 16 mm
at MSM+ HB 20 kW). Connect the cooling circuit (inlet and return flow) to the water supply and check if the
hose connections are tight.
If you use a PowerLossMonitor PLM start the cooling approx. 2 minutes before the start of the measurement
and stop it approx. 1 minute after the end of the measurement. Only cool the device during measurement,
the number of operating hours influences the service life of the turbine in the PowerLossMonitor PLM.
8.9.1
Connecting water supply
The plug-in connectors are sealed with plugs on delivery so that no residual water can leak out. Remove the
sealing plugs and keep them for later transport or shipment.
1. Push
2. Pull
Release ring
1. Push down the release ring of the connection and pull
out the plug with your free hand.
2. Remove the sealing plugs of the water connections
3. Keep them in a save place.
Fig. 8.4:
Remove the sealing plugs of the water connections
4. Connect the flow line (Water In) and the return line (Water Out) of the device, by inserting the hose as far
as possible (approx. 20 mm deep).
5. Check whether the hose connections are tight.
Содержание MicroSpotMonitor Plus HighBrilliance
Страница 2: ......
Страница 3: ...3 Revision 00 EN 02 2022 MSM HB 35 0 6 IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE USE...
Страница 7: ...7 Revision 00 EN 02 2022 MSM HB 35 0 6...
Страница 95: ...95 Revision 00 EN 02 2022 MSM HB 35 0 6 13 Declaration of conformity...
Страница 96: ...96 Revision 00 EN 02 2022 MSM HB 35 0 6...
Страница 98: ...98 Revision 00 EN 02 2022 MSM HB 35 0 6 15 Dimensions 15 1 Dimensions of the MSM HB10 A...
Страница 99: ...99 Revision 00 EN 02 2022 MSM HB 35 0 6 Dimensions of the MSM HB10 continued View A...
Страница 100: ...100 Revision 00 EN 02 2022 MSM HB 35 0 6 15 2 Dimensions of the MSM HB10 with fibre bridge A...
Страница 101: ...101 Revision 00 EN 02 2022 MSM HB 35 0 6 Dimensions of the MSM HB10 with fibre bridge continued B View A...
Страница 102: ...102 Revision 00 EN 02 2022 MSM HB 35 0 6 Dimensions of the MSM HB with fibre bridge continued View B...
Страница 103: ...103 Revision 00 EN 02 2022 MSM HB 35 0 6 15 3 Dimensions of the MSM HB20 at zmax C...
Страница 104: ...104 Revision 00 EN 02 2022 MSM HB 35 0 6 Dimensions of the MSM HB20 continued View C...
Страница 105: ...105 Revision 00 EN 02 2022 MSM HB 35 0 6 15 4 Dimensions of the MSM HB20 with fibre bridge at zmax D...
Страница 106: ...106 Revision 00 EN 02 2022 MSM HB 35 0 6 Dimensions of the MSM HB20 with fibre bridge continued View D...
Страница 116: ...116 Revision 00 EN 02 2022 MSM HB 35 0 6...