
33
Figure 2b
Figure 3
Connecting Sensors to the TLM
The TLM Load Module accepts signals from strain
gauges.
Figure 3 illustrates the sensor connections available
on the
TLM.
Tonnage Load Monitor
(optional)
Mounting & Connecting
Figure
2
2. Insert the cable through the lug as shown in Figure
2a. Make sure the cable shield is aligned with the
portion of the wire lug which will be crimped.
3. Next, crimp the lug on to the cable shield, do not
crimp too tight and risk smashing the wires. This
could cause them to short to ground. Figure 2b
shows a side view of the completed operation
after crimping.
Figure 2a
Figure
2b
4.Attach the wire lug to a ground terminal on the
front of the TLM. Use a 6-32 x ¼’ screw for the
grounding lug connection.
Note: If your sensor is not double shielded with
both foil and a braid, electrical noise may affect
your output readings.
Note: Some brands of sensors use a different
color code than the red/white/black colors. It is
important to check the spec sheet of the sensor.
The spec sheet will indicate the excitation and
signal.
Figure 1
Содержание PressCam 8
Страница 1: ...PressCam 8 Installation Operations Manual ...
Страница 2: ...Rev 5 0 ...
Страница 14: ...6 Internal Wiring Diagram 28 101 System Installation ...
Страница 15: ...7 Control Box Dimensions 28 102 System Installation ...
Страница 16: ...8 Panel Cut Out Dimensions 28 103 System Installation ...
Страница 17: ...9 Control Panel Dimensions 28 104 System Installation ...
Страница 18: ...10 System Installation External Wiring Diagram 28 105 ...
Страница 19: ...11 System Installation I O Board Dimensions 28 106 ...
Страница 44: ...36 Tonnage Load Monitor optional Installation T400 Installation ...