Page 6
Faucet Installation (Actual RO Faucet may vary)
Feed both the red and black tubing through the pre drilled hole in the sink/counter until faucet
is seated.
Locate one of the two 1/4” blue tubes in the box. In the faucet parts bag locate a compression
nut, plastic ferrule sleeve and a plastic tube insert. To assemble - place the compression nut
on the open end of the blue tube first, then the plastic ferrule sleeve small tapered end of
sleeve must point to the end of tube, push the white plastic insert into the end of blue tubing
with the ferrule sleeve, insert the blue tube into the faucet stem and tighten compression nut.
DO NOT overtighten nut.
Step 6
Step 7
Содержание EZ-RO 4
Страница 18: ...Page 18 Nitrate Nitrite Test Instruction...
Страница 25: ...Page 25...