background image

Page 11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Start up Instructions

Register by mail, phone, fax or internet.   Premier uses this information only to provide a filter 

change reminder notice.  Pre-filters should be changed every 6 months and the Post Carbon 

filter annually.  You may register your warranty via our web site at 

www.premierH2o.com or call 1-800-752-5582 (within USA only) / FAX#: 623-866-5666. 

For Warranty card Please see page 23-24.

If you have connected your RO system to a refrigerator / ice maker, make sure the ice maker 

is off (do not allow water to flow to the ice maker) until flushing (Step 5) is complete and the 

tank has been allowed to completely fill. Connection from the RO to the ice maker system 

should have an in-line valve installed before the ice maker so it can easily be closed to prevent 

water flowing to the ice maker during start up and periodic maintenance. Your RO tank must 

be allowed to fill up fully in order for the ice maker system to work properly. 

After the Tank has filled, open the RO Faucet to flush the tank completely. You will know that 

the tank is empty when the flow rate from the RO faucet is down to a trickle.  Repeat this step 

two more times.  The fourth tank can be used for drinking. 

The flushing process should take about a day to complete. 

Don’t Forget To Register!

Open  the  RO  faucet  and  leave  it  open  until  water  begins  to  trickle  out  (it  will  come  out 

slowly).

Step 5

Turn on the incoming cold water at the angle stop valve.  Open the needle valve on the brass 

Adapt-a-Valve by turning counter clockwise. Check the system for leaks and tighten any fitting 

as necessary.  Make sure that the ball valve on top of the storage tank is in the open position 

- blue handle is in line with the blue tube. 

(Check frequently over the next 24 hours to ensure no leaks are present).

Step 4

Step 3

Step 2

Step 1

Close the RO faucet allowing the storage tank to fill with water.

  It may take 4 to 6 hours to 

fill the tank completely depending on the production capability of the membrane, local water 

temperature and water pressure. 

Congratulations!

You have completed the installation of new your Reverse Osmosis system.

Please Follow the Startup Instructions.

Note:       

During the fill period you may hear water trickling due to the Reverse Osmosis Process.

Flushing of the tank 3 times is only necessary during the initial startup and after replacing the 

membrane.

Note:

Содержание EZ-RO 4

Страница 1: ...Inc 8716 W Ludlow Drive Suite 1 Peoria AZ 85381 Phone 800 752 5582 www premierH2o com Fax 623 866 5666 Save manual for future reference Warning Please read carefully before proceeding with installatio...

Страница 2: ...age of your RO system is a five micron sediment filter that traps sediment and other particulate matter like dirt silt and rust which affect the taste and appearance of your water Stage 2 Carbon filte...

Страница 3: ...allation 7 Drain Saddle Installation 7 Drill hole and Connect 3 8 Black Tube from Faucet to the Drain Saddle 8 How To Use Quick Connect Fittings For Tubing Connections 8 Connection on the back of the...

Страница 4: ...ic Drill 1 4 3 8 Drill Bits Contents of Reverse Osmosis RO System Copper Tubing Reverse Osmosis water should not be run through copper tubing as the purity of the water will leach copper causing an ob...

Страница 5: ...bricating oil or liquid soap to keep the hole saw cool during cutting Step 2 Drill a Hole for the Faucet in a Porcelain Sink Punch a Hole for the Faucet in a Stainless Steel Sink Drill a pilot hole Us...

Страница 6: ...locate a compression nut plastic ferrule sleeve and a plastic tube insert To assemble place the compression nut on the open end of the blue tube first then the plastic ferrule sleeve small tapered en...

Страница 7: ...sides of the drain saddle Keep the plastic compression nut off at this time The small square black foam gasket with a circle cut out of the middle must be applied to the inside of the drain saddle Rem...

Страница 8: ...drill through the drain pipe Step 13 Caution It is very important to keep the drill centered to prevent damage of the drain saddle while drilling How To Use the Quick Connect Fittings on the RO Modul...

Страница 9: ...e RO system behind the Post Carbon filter head Blue Label by pushing firmly into the fitting See Picture Above Connect Green tube to the Adapt a Valve Step 18 Insert the green tube attached to the RO...

Страница 10: ...the stainless steel fitting on top of the tank Tank Ball Valve Installation Part 134018 Thread the quick connect ball valve supplied in the parts bag onto the stainless steel connector on the tank No...

Страница 11: ...rom the RO faucet is down to a trickle Repeat this step two more times The fourth tank can be used for drinking The flushing process should take about a day to complete Don t Forget To Register Open t...

Страница 12: ...you notice a reduction in water production or an unpleasant taste in the reverse osmosis water it could be time to replace the membrane Premier recommends replacing the membrane when TDS reduction fa...

Страница 13: ...wise 1 4 turn Check frequently over the next 24 hours to ensure no leaks are present Step 5 Step 4 Note Step 2 Close the RO faucet allowing the storage tank to fill with water It may take 3 to 5 hours...

Страница 14: ...r pressure in the storage tank when you notice a decrease in available water from the RO system Air can be added with a bicycle pump using the schrader valve that is located on the lower side of the t...

Страница 15: ...si See previous page Low Pressure in Tank Use a Digital Air Gauge for best results The empty tank pressure should be 5 7 psi See page 14 4 Noise Water from faucet Crimp or restriction Check tubing and...

Страница 16: ...te 30 4 2 86 0 7 24 50psi 4 8 30 0 10 10 0 Perchlorate 0 14 0 003 97 0 7 39 50psi 0 005 mg L 0 10 10 0 006 Radium 226 228 25pCi L 5pCi L 80 0 7 24 50psi 5pCi L 25pCiL 10 5pCiL Selenium 94 85 0 2 97 0...

Страница 17: ...onvert all the trivalent arsenic in to pentavalent arsenic If you get your water from a public water utility contact the utility to find out if free chlorine or combined chlorine is used in the water...

Страница 18: ...Page 18 Nitrate Nitrite Test Instruction...

Страница 19: ...rs needed Call 1 800 752 5582 or buy on line at www premierH2o com All prices subject to change without notice Connect your RO Pure system to your refrigerator The ice maker kit includes parts needed...

Страница 20: ...essure regulator to prevent damage to appliances Part No 261003 11 50 ea Pocket Total Dissolved Solids TDS Monitor Test water electronically to verify reverse osmosis membrane effectiveness Carrying c...

Страница 21: ...e Plated Finish Reversible Filter Cartridge Model HHC Cartridge Life Rating 3 months Part No 107095 CHROME 55 95 All In One reversible High Flow Filter Replacement filter Deluxe 5 Way Massaging Spray...

Страница 22: ...fety of your personal information Premier collects personal information when you register with Premier This information is stored in our data base and we do not rent sell or share personal information...

Страница 23: ...ountry USA CANADA MEXICO OTHER ____________ Phone ______ __________ __________ Email Address ______________________ Date of Purchase ___________________ Date of Install _______________________ Install...

Страница 24: ...rchase __________ Date of Install ___________ Installed by _____________ NOTES Date Sediment Filter 6 months Membrane 2 5 years Carbon Pre Filter 6 months Carbon Post Filter 12months Model Number ____...

Страница 25: ...Page 25...

Страница 26: ...g water pressure must be between 40 and 85 pounds per square inch 6 Incoming water to the RO cannot exceed 105 degrees F 40 degrees C 7 Incoming TDS Total Dissolved Solids not to exceed 1800 ppm 8 Do...

Отзывы: