![Premier Mounts PP-FCTA Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/premier-mounts/pp-fcta/pp-fcta_installation-instructions-manual_1596215028.webp)
SPI-PRO
Page 16
Visit the Premier Mounts website at http://www.mounts.com
Installation Instructions
Removing the Projector
Use the M5 security Allen wrench to loosen the
M4 x 12mm Lock-It™ screw.
Place one hand under the projector to support it.
®
Lift the locking tab.
¯
While lifting the locking tab, rotate the SpiroLock™
collar assembly 15 degrees clockwise until you hear
an audible “click”.
You may find it easier to lift the locking tab with
the thumb of the same hand which rotates the
SpiroLock™ collar assembly.
°
Use both hands to rotate the projector plate as shown
to separate it from the SpiroLock™ collar assembly.
±
Place the projector on a soft, flat surface and
disassemble the mounting legs from the projector, if
neccessary.
Step 1
Step 2
The SpiroLock™ projector mount can be removed quickly if the projector needs service.
If the projector is heavy and/or bulky, two people may be required to safely remove the projector from the
SpiroLock™ Ceiling Plate or NPT pipe.
If the projector is mounted higher than shoulder height, you may need to use one or more ladders to
safely remove the projector from the SpiroLock™ Ceiling Plate or NPT pipe.