![Premier Mounts PP-FCTA Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/premier-mounts/pp-fcta/pp-fcta_installation-instructions-manual_1596215027.webp)
SPI-PRO
Installation Instructions
Visit the Premier Mounts website at http://www.mounts.com
Page 15
Attaching the Projector to the Mount (cont’d)
Step 3
M10 x 10mm
Set Screw
Tighten the M4 x 12mm Lock-It™ screw in the
SpiroLock™ collar assembly.
Alignment & Fine-Tuning
Loosen the two (2) M10 x 10mm set screws to fine-tune the projector alignment.
®
Adjust the pitch, roll, and yaw of the projector up to 6° by firmly grasping the projector with both hands and slowly
tilting it forward, backward, and side-to-side.
¯
Make precise adjustments by placing the tip of a flat-blade screwdriver between the projector plate and the lip of the
spindle, then using gentle leverage to make any adjustments.
°
Tighten the two set screws in the spindle to lock in your adjustments.
Do not overtighten the set screws.